交通インサイト
ネットワークを設計する
地図上に路線を描いて、どこに行けるかを確認できます。
Build a multi-route plan. Unedited routes stay as scheduled; this draft is never submitted automatically.
Route tools
Route tools
Click a published line
Context layers
Counted jobs are historical context, not trips. Parking points do not show open spaces.
Find a place and check sources
Other published headcounts without a precise point
- Nokia · 2,000+Ottawa R&D staff · undated_current_page · The same page reports 2,300+ employees across Canada. Do not assign that national count to Kanata. The page does not date this count or publish daily attendance.Source ↗
- Nokia · 1,900+Ottawa R&D staff — earlier report · 2025-11-25 · An earlier lower-bound count, not a count of people at the future campus. Do not add it to the current Nokia row or infer an exact growth rate from two lower bounds.Source ↗
- The Ottawa Hospital / L’Hôpital d’Ottawa · 13,281Active employees: hospital and Heart Institute, all locations · 2024–2025 · This is not one campus or one shift. Nurses and other staff categories can overlap this total; patients, visitors and students are separate travel demand.Source ↗
- CISSS de l’Outaouais · 11,50071 facilities throughout Outaouais · 2025-09-03 · Employer-reported in a dated job posting, not an audited attendance count. Includes facilities outside Gatineau and must not be assigned to the Gatineau Hospital named in the posting.Source ↗
Your route
- Stops
- —
- Length
- —
- Jobs within 400 m
- Not measured
The published paths come from the dated operator timetables. Solid purple segments follow the production street-routing graph. A dashed segment means the street path could not be confirmed yet, so it remains visibly unverified. Safe turns, bus restrictions, accessibility, transfers and operating times still need review.
Your proposed network changes
Choose a route above, or start a new one. This does not change real transit service.
Inspect and share this proposal
This is a nonofficial citizen proposal. It does not describe a published OC Transpo or STO network. Every output below retains the dated timetable baseline, your inputs, this revision and the limits of the comparison.
The shared JSON file contains this proposal revision, the selected timetable date, route baselines for edited lines, a whole-network baseline only when verified, your inputs, attached context evidence, path checks, comparisons and model limits. It is a nonofficial citizen draft.
公式フィード、計算した指標、市のデータ、利用者の観測は、はっきり分けて表示します。根拠データがない場合は「利用できません」と表示し、ゼロにはしません。