Una semana · final

78,5 % of final arrival predictions were within five minutes of the timetable in the week of 28 de septiembre (previous measure).

La explicación aún no se ha redactado para esta edición. Las cifras medidas están completas.

78,5 %

Previous measure: final arrival predictions within five minutes of the timetablePrevious measure: predictions within five minutes

Los totales de viajes aún no se miden para este período.

Medida anterior

Previous measure, 28 sept – 4 oct: share of final arrival predictions within five minutes of the timetable. Not the new on-time measure.

The full report on the previous measure

Buses a tiempo, día a día

Las barras de puntualidad aún no se miden para este período.

  1. lun 28
    Works begin, Sep 28PALLADIUM between CAMPEAU and 417 W/B off rampSegún un aviso de obras de la Ciudad
  2. lun 28
    Works begin, Sep 28STITTSVILLE MAIN between CARP and HOBIN / WILDPINESegún un aviso de obras de la Ciudad
  3. lun 28
    Works begin, Sep 28Huntmar between Hazeldean and Coriolis/GallantrySegún un aviso de obras de la Ciudad
  4. lun 28
    Works begin, Sep 28KANATA between WALDEN and KNUDSONSegún un aviso de obras de la Ciudad
  5. lun 28
    Works begin, Sep 28STONEHAVEN between SAWYER / SUMMITVIEW and Old RichmondSegún un aviso de obras de la Ciudad
  6. lun 28
    Works begin, Sep 28Hazeldean between Castlefrank and Irwin GateSegún un aviso de obras de la Ciudad
  7. mié 30
    Works begin, Sep 30QUEEN between METCALFE and ELGINSegún un aviso de obras de la Ciudad
  8. jue 1
    Works begin, Oct 1Carling between Edgeworth and Kichi Zībī MīkanSegún un aviso de obras de la Ciudad
  9. vie 2
    Works begin, Oct 2ST-LAURENT, BOUL S/B between BOURASSA and SMYTH / RUSSELL / LANCASTERSegún un aviso de obras de la Ciudad
  10. vie 2
    Works begin, Oct 2Queen between Metcalfe and ElginSegún un aviso de obras de la Ciudad
  11. vie 2
    Works begin, Oct 2Innes between Orléans Blvd and ViseneauSegún un aviso de obras de la Ciudad
  12. sáb 3
    Works begin, Oct 3FINDLAY CREEK between DEVONWOOD / CEDAR CREEK and BANKSegún un aviso de obras de la Ciudad
  13. sáb 3
    Detour Route 47 SouthRoute 47 diverted from Louis to Norval-Jones.Según avisos del operador
  14. sáb 3
    Detour Route 62 NorthRoute 62 diverted from Station Gappe to Émile-d'Auray.Según avisos del operador
  15. sáb 3
    Detour Route 62 NorthRoute 62 diverted from Station Gappe to Émile-d'Auray.Según avisos del operador
  16. sáb 3
    Detour: Route 87 during Woodroffe Avenue closure (Byron/Richmond to Kichi Zibi Mikan)March 16 2026 - From 8:00 pm on Sunday, March 29, until 11:59 pm on Friday, December 18, Woodroffe Avenue will be closed between Byron Avenue/Richmond Road and Kichi Zībī Mīkan for sewer and watermain work, as well as electrical and paving Según avisos del operador
  17. sáb 3
    Detour Route 62 SouthRoute 62 diverted from Émile-d'Auray to Sillery.Según avisos del operador
  18. sáb 3
    Stop Impacts: Bayshore Stop A & B RelocationJanuary 30 2026 - Until further notice, Bayshore Stop Band Stop C will be located on the north side of the platform.Bayshore Stop Awill also be temporarily relocated to the south side of the platform.Según avisos del operador
  19. sáb 3
    Detour: Routes entering and exiting Limebank StationAugust 15 2025 - At10:00 am on Thursday, December 18,Town Square Road and the connector road at Limebank Station will re-open to general traffic.Routes 70, 73, 74, 99, 110, 198, 283, 299will continue to follow a detour by entering and exitiSegún avisos del operador
  20. sáb 3
    DETOUR: Route 39 in both directions near Taylor Creek.September 30 2026 - DETOUR: Route 39 in both directionsnear Taylor Creek.Según avisos del operador
  21. sáb 3
    Detour: Routes 6, 7, 10, 11, 12, 19, 57, 61, 75 during Queen Street closure (Elgin to Metcalfe)October 01 2026 - From 6:00 am on Saturday, October 3, until 7:00 pm on Sunday, October 4, Queen Street will be closed in both directions between Elgin Street and Metcalfe Street for a crane to remove equipment from the area.Según avisos del operador
  22. sáb 3
    Stop impacts: Blair Station stop I relocation (UPDATED)October 10 2025 - Updated on Friday, February 27, 2026 From 11:00 am on Tuesday, October 14 and continuing throughfall 2026*, stop I at Blair Station will be temporarily closed.Según avisos del operador
  23. sáb 3
    Permanent relocation: Westboro ASeptember 18 2024 - Permanent relocation On Sunday, October 6at 4:00 am, Westboro A will be relocated to the west of Athlone, across from Westboro B for Stage 2 construction.Según avisos del operador
  24. sáb 3
    NCC Weekend Bikedays: Routes 57, 61, 62, 63, 74, 75, 87 to detourMay 07 2026 - Beginning on Saturday, May 9, NCC Weekend Bikedays returns to the Kichi Zībī Mīkan!Según avisos del operador
  25. sáb 3
    DETOUR: Route 153 in both directions near McEwen LoopSeptember 15 2026 - 153 Lincoln Fields Stops missed:MCEWEN LOOP - (4931),70 MCEWEN - (6248),70 MCEWEN - (2338) Alternate stops:AMBLESIDE / MCEWEN - (6247),MCEWEN / AMBLESIDE - (5716) 153 Carlingwood Stops missed:MCEWEN LOOP - (4931),70 MCEWSegún avisos del operador
  26. sáb 3
    Detour: Routes 7, 10, 48, 111 during Campus Avenue closure (Carleton University)August 06 2026 - Detour end date changed to December 18, 2026 (updated on September 3).Según avisos del operador
  27. sáb 3
    Extra trips on Route 256 Tunney’s PastureSeptember 25 2026 - We’ve added weekday trips on Route 256 Tunney’s Pasture (from Bridlewood) at 6:30 am and 6:58 am.Según avisos del operador
  28. sáb 3
    Relocation notice: Trim Station bus loopSeptember 18 2024 - On Sunday, September 22 at 4 am,the current Trim Station will be permanently relocated to the new Trim Station Bus Loop due to the closure of of South Frontage between Old Trim and New Trim Road, in addition to the southSegún avisos del operador
  29. sáb 3
    DETOUR: Route 153 in both directions near McEwen LoopOctober 03 2026 - 153 Lincoln Fields Stops missed:MCEWEN LOOP - (4931),70 MCEWEN - (6248),70 MCEWEN - (2338) Alternate stops:AMBLESIDE / MCEWEN - (6247),MCEWEN / AMBLESIDE - (5716) 153 Carlingwood Stops missed:MCEWEN LOOP - (4931),70 MCEWENSegún avisos del operador
  30. sáb 3
    75 Tunney's Pasture : Cancelled trip75 Tunney's Pasture: The trip is cancelled from BARRHAVEN CENTRE Station 17:37 to TUNNEY'S PASTURE Station 18:24.Según avisos del operador
  31. sáb 3
    Detour extended: Cheo Roadway closure (1Door4Care)April 28 2025 - Until further notice, Route 45 Hurdmanand 5will be detoured due to the closure of CHEORoadway for the 1Door4Care: CHEO Integrated Treatment Centre development.Según avisos del operador
  32. sáb 3
    Stop impacts: Bayview BDecember 03 2024 - Until further notice,Bayview Bwill be relocated to Scott Street (south side) / Bayview station Road for work.Según avisos del operador
  33. sáb 3
    Detour: WB routes 61, 62, 63 around nightly closure of WB 417 off-ramp to PinecrestOctober 02 2026 - Nightly, from October 5 until the morning of October 9, between 11:00 pm and 5:00 am, the WB Highway 417 off-ramp to Pinecrest Road will be closed for Stage 2 work.Según avisos del operador
  34. sáb 3
    Detour: Route 20 Rideau due to closure of Alfred and lanes on MontfortOctober 01 2026 - From 10:00 am on Monday, October 5, until 6:00 pm on Friday, December 4, a closure of Alfred Street and lanes of Montfort Street for the Montfort, Alfred, and Granville Integrated Renewal Project, will require route 20 RidSegún avisos del operador
  35. sáb 3
    Detour: EB routes 11, 57, 58, 81, 691 around Richmond and Bayshore lane closuresSeptember 18 2026 - From 6:00 am on Monday, September 21, until 6:00 pm on Wednesday, October 21, the southbound left turn lane from Bayshore Drive to Richmond Road, as well as the left turn lane from the Highway 417 off-ramp to Richmond soSegún avisos del operador
  36. sáb 3
    Stop impact: #3039 -- Airport A relocationJune 09 2026 - From 10:00 am on Wednesday, June 10, until 6:00 pm on Saturday, October 10, stop #3039 -- Airport A will be relocated to the southeast end of theupper roadway (Departures, level 3).Según avisos del operador
  37. sáb 3
    Elevator: Rideau StationNovember 01 2025 - Rideau Station WBElevator # 02: The westbound elevator #2 at Rideau Station, is out of service for unforeseen maintenance.Según avisos del operador
  38. sáb 3
    Detour: Routes 61, 62, 63 around WB 417 on-ramp from Moodie SBOctober 01 2026 - From 11:00 pm on Monday, October 5, until 5:00 am on Tuesday, October 6, the northwest on-ramp to the WB 417 from Moodie Drive southbound will be closed for the installation of a ramp gate.Según avisos del operador
  39. sáb 3
    Stop impacts: #3019 -- Pinecrest A and B relocationSeptember 01 2026 - Updates to routing and alternate stops for routes 301, 303, 404, 406, and 454 made on September 14, 2026.Según avisos del operador
  40. sáb 3
    Limebank Station: Passenger pick-up and drop-off area relocationDecember 12 2025 - At 10:00 am on Thursday, December 18, Town Square Road and the connector road at Limebank Station will re-open to general traffic.Según avisos del operador
  41. sáb 3
    Service Impact: Baseline Station Park and Ride – Temporary Lot ConfigurationMay 02 2025 - Starting Thursday, May 1, 2025, until further notice, the Park and Ride at Baseline Station will be temporarily split into two separate lots (north and south).Según avisos del operador
  42. sáb 3
    Detour Route 47 SouthRoute 47 diverted from Louis to Norval-Jones.Según avisos del operador

Sus rutas y las peores de la semana

Las peores rutas de la semana

The route shares below are on the previous measure too: final arrival predictions within five minutes of the timetable. They are not graded.

  • 45
    45
    38%
  • 23
    23
    48%
  • 56
    56
    48%
  • 52
    52
    49%