Week report ending Aug 2, 2026
Every figure here is a count of arrivals this site observed and settled, added up over the service dates in the period. Routes are named for running well on the same evidence they are named for running badly.
Frozen publication
Published on Sep 15, 2026, 1:12 a.m. under settled-arrival-period-report-v2. This stored snapshot will not be recomputed when evidence or code changes.
Across the network
Jul 27, 2026 to Aug 2, 2026 · 2 of 7 calendar days measured
- Arrivals on time
- 72.4%
- Arrivals observed
- 322,270
- Routes measured
- 70
The prior equal calendar period is unavailable or incomplete, so no change is calculated.
Dates absent from the figures
No completed rollup exists for these dates. They are shown as missing and are not treated as zero or as good service.
- Jul 27, 2026
- Jul 28, 2026
- Jul 29, 2026
- Jul 30, 2026
- Jul 31, 2026
Most reliable this period
The routes with the highest share of settled arrivals within five minutes of the timetable. All use the same route class, evidence threshold and period. This is a relative ranking, not an operator target.
Furthest from the timetable
The routes with the lowest share of on-time arrivals. A low figure does not say whose fault it is: a route can be late because its timetable is wrong, because the service is failing, or because of the traffic it runs in. Each route page separates those.
Frozen publication
- Calculation method
- settled-arrival-period-report-v2
- Evidence available through