Skip to main content

Usage analytics is on by default to improve Otranspo. You can turn it off here.

FR

Orléans East-Cumberland

Sherif Rizk

AnsweredNo time counted

The correspondence

Published messages and withheld-reply notices follow the order sent or received. Each document shows its first publication date separately.

  1. Email we sent

    Otranspo · Sent or received · First published

    Your ward's transit scorecard, and the $700K contract council never voted on

    Dear Sherif Rizk,

    I'm an Ottawa resident, a transit rider, and the builder of otranspo.ca, an independent transit platform made in Ottawa. Before anything else, here is the live transit scorecard for Orléans East-Cumberland: https://otranspo.ca/en/city/wards/1. Right now it shows 82.0% of arrivals landing within five minutes of schedule, graded route by route from OC Transpo's own settled arrivals over the last fourteen days, next to a live map of the vehicles running through the ward and a plain list of what would fix the worst of it. Use it at the doors and in debates, no strings attached.

    Here is why I'm writing. Since 2023, the City has committed close to $700,000 to the Montreal company that makes the Transit app, all on one contract (33523-92002-G01). $282,000 for monitoring the real-time data, $180,000 to roll out the free Royale subscription, and another $233,794 in 2025 for rider surveys inside the app. There was no RFP, it was all sole-sourced under an exception in the Procurement By-law, and it never went to council for a vote, staff signed it under delegated authority. It's all in the City's own contract disclosures:

    https://documents.ottawa.ca/sites/default/files/Document%201%20%E2%80%93%20Transit%20Contracts%20awarded%20under%20delegated%20authority%20for%20the%20per_AODA.pdf

    https://documents.ottawa.ca/sites/default/files/Contracts%20Under%20Delegation%20of%20Authority%20January%201%20to%20June%2030%202025-AODA.pdf

    The disclosures also leave basic questions unanswered. Royale is a subscription product, so is the $180,000 a one-time cost or an annual one, and is it priced per rider or a flat fee? At Transit's advertised price of $24.99 a year, $180,000 only covers about 7,200 subscriptions in a city of a million people, and nobody can say what we actually bought because the term and pricing were never made public. The 2025 payment also means the City is paying a Montreal company to compile crowdsourced feedback from Ottawa's own riders.

    Across the river, the STO gets the same app for free. When Gatineau launched real-time tracking in Transit in 2019, the STO's president said publicly that the partnership cost nothing, because showing an agency's buses is Transit's free tier (Le Droit, Jan. 31, 2019: https://ledroit.com/actualites/gatineau/sto-les-parcours-en-temps-reel-6ec8c8b15a3398d70012e209c2fcc63e). What Ottawa paid for is the extras, monitoring the quality of the City's own data feed, sponsoring a premium subscription, and buying crowdsourced rider surveys.

    Riders already get those extras free on otranspo.ca, with independent scorecards for every ward, route and station, crowdsourced rider reports at https://otranspo.ca/en/report where riders log the no-show buses, crowding and breakdowns the official feed never records, and live tracking with real-time traffic. There is nothing to subscribe to, and it costs the City nothing.

    Ottawa already has the bones of a world class system. What we've lost is trust, and residents need to see the system working, not just be told that it works.

    So I'm asking you to commit to three things if you're elected:

    1. A public review at Transit Commission of the sole-source Transit app contract, including its full cost, term, pricing structure, and performance, before it gets extended again.

    2. Fair, open, competitive processes for rider-facing transit technology going forward.

    3. An open partnership framework so qualified Ottawa-built platforms, mine included, can integrate with OC Transpo and share crowdsourced data back with the City.

    I'm publishing every candidate's answer on otranspo.ca before advance voting starts October 1, yes, no, or silence. I'd also welcome 15 minutes to show you or your team the platform.

    Respectfully, Wyatt Baldwin otranspo.ca

    Check this record

    Publication state: Published verbatim

    Stored source matches the ingestion hash.

    SHA-256 d062609fd5f835a25f1730151f654d54c7e5fa3803ca3a4d26b1cd575669613f

    Link to this message

  2. Email we sent

    Otranspo · Sent or received · First published

    A correction to my September 9 letter, and the 15 minutes I offered

    Dear Sherif Rizk,

    I wrote to you on September 9 about the City's Transit app contract. Two things since, and one of them is a correction I owe you.

    My letter put the City's commitments on the Transit app contract (33523-92002-G01) at close to $700,000. The correct figure is $1,157,794. I left out a fourth line because I wasn't certain of the amount: a $462,000 extension in the City's July to December 2024 disclosure, for the app plus customer surveys, data-quality analysis and performance benchmarking. Jenna Jessop, a candidate in Orléans West-Innes, read the disclosures herself and asked me about it. She was right, and I'm grateful she raised it. The corrected total, all four source lines and the revision record are on the contract page: https://otranspo.ca/en/insights/transit-app-contract

    In that letter I also offered 15 minutes to show you the platform. I'm holding that until after election day. With advance voting about to start, the last four weeks of a campaign are not the time for me to be asking for yours. After October 26 the offer stands for anyone who wants it, elected or not, and I'll write again then.

    As my letter said, every candidate's answer is published at https://otranspo.ca/en/public-record/candidates-2026 on Thursday, October 1, the day advance voting starts, and the page records who answered and who didn't. If you want your position on the record, a reply by Wednesday, September 30 is all it takes; the three asks are unchanged.

    Respectfully, Wyatt Baldwin otranspo.ca

    Check this record

    Publication state: Published verbatim

    Stored source matches the ingestion hash.

    SHA-256 77f31a2c4edac5cb115841c6a78bb53e1e04656e7b507dfbbcb6886e95718cbe

    Link to this message

  3. Reply email

    Written by them · Sent or received · First published

    Re: Your ward's transit scorecard, and the $700K contract council never voted on

    Hi Wyatt, Thank you for reaching out and for sending me the Ward 1 scorecard. I spent some time reviewing both your platform and the underlying City disclosures because the issues you raise fit closely with something I have been talking about throughout this campaign: we need to measure transit based on what riders actually experience. One point I noticed is that your research has evolved since the email was drafted. Your website now identifies an additional $462,000 extension in 2024 and puts the total disclosed value associated with contract 33523-92002-G01 at *$1,157,794*, rather than approximately $700,000. I appreciate that you published the correction transparently. I am not prepared, without reviewing the complete contract and hearing from staff, to conclude that the City received poor value or that sole-sourcing was unjustified. The City's Procurement By-law permits non-competitive procurement in certain circumstances. But its stated guiding principle is also that procurement should generally be *open, transparent and fair*, and expenditures of this magnitude deserve enough information for Council and the public to assess value for money. On your three requests: *1. Public review: Yes.* I would support having the Transit Commission receive a public accounting of this contract before any further material extension, including its cumulative cost, term, deliverables, pricing structure, performance measures, usage and the rationale for continuing with a non-competitive arrangement. The fact that an expenditure was properly authorized under delegated authority does not mean Council should never subsequently examine whether it continues to represent good value. *2. Competitive procurement: Yes, with an appropriate qualification.* My presumption for future rider-facing technology would be an open and competitive process wherever practical. There can be legitimate circumstances in which interoperability, intellectual property, continuity or another procurement exception justifies a different process. Where that occurs, however, I would expect the rationale to be clearly documented and the City to demonstrate value for money. *3. Open partnership framework: Yes in principle.* I am very interested in the idea of allowing qualified third-party platforms to make productive use of OC Transpo's open data and, where technically and legally appropriate, establishing a framework through which useful crowdsourced information could flow back to the City. I would want staff to address data standards, privacy, cybersecurity, accessibility, bilingual-service requirements and validation before the City relied upon externally generated information operationally. But those are implementation questions, not reasons to shut the door on innovation. Your Ward 1 scorecard is particularly interesting to me because my platform proposes an *Orléans Transit Reliability Guarantee*. I have argued that a system-wide reliability percentage can conceal what an individual passenger experiences. I want reporting that gets closer to the actual journey, including route, time of day, waiting, transfers, missed connections and total journey time. So I would be interested in seeing how you calculate your 82% figure, what limitations you have encountered using OC Transpo's data, and how your crowdsourced reports complement the official feed. I'd be happy to take you up on the offer of a 15-minute demonstration. Feel free to send me a few times that work for you or coordinate with my campaign. Thank you as well for building something locally and making it available to riders. Whether or not the City ultimately uses your particular platform, I think Ottawa should be creating an environment in which local innovators have a fair opportunity to demonstrate what they can do. On Wed, Sep 9, 2026 at 9:35 PM Wyatt Baldwin · otranspo.ca < hello@otranspo.ca> wrote: > Dear Sherif Rizk, > > I'm an Ottawa resident, a transit rider, and the builder of otranspo.ca, > an independent transit platform made in Ottawa. Before anything else, here > is the live transit scorecard for Orléans East-Cumberland: > otranspo.ca/en/city/wards/1. Right now it shows 82.0% of arrivals landing > within five minutes of schedule, graded route by route from OC Transpo's > own settled arrivals over the last fourteen days, next to a live map of the > vehicles running through the ward and a plain list of what would fix the > worst of it. Use it at the doors and in debates, no strings attached. > > Here is why I'm writing. Since 2023, the City has committed close to > $700,000 to the Montreal company that makes the Transit app, all on one > contract (33523-92002-G01). $282,000 for monitoring the real-time data, > $180,000 to roll out the free Royale subscription, and another $233,794 in > 2025 for rider surveys inside the app. There was no RFP, it was all > sole-sourced under an exception in the Procurement By-law, and it never > went to council for a vote, staff signed it under delegated authority. It's > all in the City's own contract disclosures: > > Transit contracts awarded under delegated authority (PDF) > <https://documents.ottawa.ca/sites/default/files/Document%201%20%E2%80%93%20Transit%20Contracts%20awarded%20under%20delegated%20authority%20for%20the%20per_AODA.pdf> > > Contracts under delegation of authority, January 1 to June 30, 2025 (PDF) > <https://documents.ottawa.ca/sites/default/files/Contracts%20Under%20Delegation%20of%20Authority%20January%201%20to%20June%2030%202025-AODA.pdf> > > The disclosures also leave basic questions unanswered. Royale is a > subscription product, so is the $180,000 a one-time cost or an annual one, > and is it priced per rider or a flat fee? At Transit's advertised price of > $24.99 a year, $180,000 only covers about 7,200 subscriptions in a city of > a million people, and nobody can say what we actually bought because the > term and pricing were never made public. The 2025 payment also means the > City is paying a Montreal company to compile crowdsourced feedback from > Ottawa's own riders. > > Across the river, the STO gets the same app for free. When Gatineau > launched real-time tracking in Transit in 2019, the STO's president said > publicly that the partnership cost nothing, because showing an agency's > buses is Transit's free tier (Le Droit, Jan. 31, 2019: Le Droit report > <https://ledroit.com/actualites/gatineau/sto-les-parcours-en-temps-reel-6ec8c8b15a3398d70012e209c2fcc63e>). > What Ottawa paid for is the extras, monitoring the quality of the City's > own data feed, sponsoring a premium subscription, and buying crowdsourced > rider surveys. > > Riders already get those extras free on otranspo.ca, with independent > scorecards for every ward, route and station, crowdsourced rider reports at > otranspo.ca/en/report where riders log the no-show buses, crowding and > breakdowns the official feed never records, and live tracking with > real-time traffic. There is nothing to subscribe to, and it costs the City > nothing. > > Ottawa already has the bones of a world class system. What we've lost is > trust, and residents need to see the system working, not just be told that > it works. > > So I'm asking you to commit to three things if you're elected: > > 1. A public review at Transit Commission of the sole-source Transit app > contract, including its full cost, term, pricing structure, and > performance, before it gets extended again. > > 2. Fair, open, competitive processes for rider-facing transit technology > going forward. > > 3. An open partnership framework so qualified Ottawa-built platforms, mine > included, can integrate with OC Transpo and share crowdsourced data back > with the City. > > I'm publishing every candidate's answer on otranspo.ca before advance > voting starts October 1, yes, no, or silence. I'd also welcome 15 minutes > to show you or your team the platform. > > Respectfully, > Wyatt Baldwin > otranspo.ca > -- *Sherif Rizk* *Candidate for City Councillor - Ward 1* *Orléans East-Cumberland* 880 Taylor Creek Drive Orléans, ON K4A 0Z9 Tel: 613-689-3522 Email: info@sherifrizk.ca

    Check this record

    Publication state: Published verbatim

    Stored source matches the ingestion hash.

    SHA-256 e85e27306ef046bfe189b3a3f53231a0aa345480aab1c136137f85d62810ced8

    Link to this message

Delivery and reply timeline

Mail delivery state
Sent; delivery unconfirmed
State recorded
September 9, 2026 at 9:35 p.m. EDT
  1. Sent; delivery unconfirmed
  2. Email we sent · Otranspo
  3. Sent; delivery unconfirmed
  4. Email we sent · Otranspo
  5. Reply email · Written by them

The three things we asked for

The reading below is ours, not a quotation. Their own words are further down, and you can judge for yourself.

1 Contract review
CommittedYes: a public accounting at Transit Commission before any further material extension, covering cumulative cost, term, deliverables, pricing, performance, usage and the rationale for staying non-competitive.
2 Open procurement
CommittedYes, with a stated qualification: open competition is the presumption wherever practical; any exception must be documented and shown to be value for money.
3 Open integration
CommittedYes in principle: a framework for qualified third-party platforms to use OC Transpo open data and return crowdsourced information, with staff addressing standards, privacy, security, accessibility, bilingual service and validation.

Changes to this page

  • September 30, 2026Publication decision recorded 30 September 2026: the reply is published verbatim, released together with every other reply on 1 October 2026 at 07:00 Ottawa, the day advance voting starts, as the letter of 9 September said.Publication state changed: Pending editorial review to Published verbatimAffected message

If your entry is here

Every entry stays open. A reply that arrives months from now is published and the page says it arrived after publication, with both dates. If anything here is wrong, write to us and the correction is published with what changed and when. If you replied and would rather your words were not printed, say so and we will publish your position without your text, and record that you asked.

Write to us