أعمال الطرق وإغلاقات الطرق بسبب الفعاليات التي نشرتها مدينة أوتاوا، وقد قُيس قربها من مسار هذا الخط. القرب لا يثبت أن الحافلة محوّلة عن مسارها. راجع تنبيهات المشغّل نفسه لمعرفة ذلك.
أعمال طرق
HILDA between SCOTT and O'MEARA
31/08/2026، 6:00 ص to 13/11/2026، 7:00 م
HILDA closed between SCOTT and O'MEARA due to construction, from August 31st 6:00 am to November 13th 7:00 pm. Access for local traffic maintained.
about 0 m from the route
City record updated 31/08/2026، 8:00 م.
أعمال طرق
Booth - between Fleet and Chaudiere Crossing
04/09/2026، 7:40 ص to 31/03/2027، 7:00 م
Booth - off-peak lane reduction between Fleet and Chaudiere Crossing. Flagpersons present. From 7:40am, 04/09/26 to 7:00pm, 31/03/27
about 2 m from the route
City record updated 04/09/2026، 9:41 ص.
أعمال طرق
March between Station rd and Teron
26/10/2026، 12:00 ص to 20/11/2026، 5:00 م
March off-peak lane reductions in both directions between Station rd and Teron due to construction, from October 26th to November 20th.
تصنف المدينة هذا على أنه يؤثر في النقل العام.
about 0 m from the route
City record updated 27/10/2026، 6:14 ص.
أعمال طرق
BOOTH between VIMY PLACE and Chaudière pr
27/10/2026، 12:00 ص to 06/11/2026، 5:00 ص
BOOTH closed nightly between VIMY PLACE and Chaudière pr due to construction, from October 28th to November 6th between 8:00pm and 5:00am. Follow the signed detour.
تصنف المدينة هذا على أنه يؤثر في النقل العام.
about 0 m from the route
City record updated 27/10/2026، 12:40 م.
أعمال طرق
417 E/B between March and Moodie
27/10/2026، 10:00 ص to 06/11/2026، 2:00 م
417 eastbound HOV lane closed between March and Moodie due to construction, from October 27th to November 6th between 10:00am and 2:00pm.
تصنف المدينة هذا على أنه يؤثر في النقل العام.
about 0 m from the route
City record updated 03/11/2026، 7:08 ص.
أعمال طرق
CARLING E/B between Kichi Zibi Mikan on Ramp and EDGEWORTH
30/10/2026، 12:00 ص to 13/11/2026، 3:00 م
CARLING eastbound reduced to 1 lane between Kichi Zibi Mikan on Ramp and EDGEWORTH due to construction, from November 2nd to 13th between 9:30am and 3:00pm.
about 0 m from the route
City record updated 30/10/2026، 11:40 ص.
أعمال طرق
Kichi Zibi Mikan between ISLAND PARK and WOODROFFE
30/10/2026، 9:30 ص to 20/11/2026، 3:00 م
Kichi Zibi Mikan reduced to 1 lane in each direction between ISLAND PARK and WOODROFFE due to construction, from November 2nd to 20th between 9:30am and 3:00pm.
about 0 m from the route
City record updated 30/10/2026، 9:28 ص.
أعمال طرق
ALBERT W/B between BAY and BOOTH
31/10/2026، 7:00 ص to 06/11/2026، 3:00 م
ALBERT westbound reduced to 1 lane between BAY and BOOTH due to construction, from November 3rd to 6th between 7:00am and 3:00pm.
تصنف المدينة هذا على أنه يؤثر في النقل العام.
about 0 m from the route
City record updated 31/10/2026، 6:56 ص.
أعمال طرق
Moodie S/B at 417 overpass
02/11/2026، 6:00 ص to 09/11/2026، 2:30 م
Moodie southbound reduced to 1 lane at 417 overpass due to construction, from November 4th to 9th between 6:00 and 2:30pm.
تصنف المدينة هذا على أنه يؤثر في النقل العام.
about 0 m from the route
City record updated 02/11/2026، 1:12 م.
A route counts as near when its timetable path passes within 40 m of the City’s mapped closure; a stop counts when it is within 75 m.
المصدر: أحداث حركة المرور في مدينة أوتاوا (أعمال الطرق والإغلاقات). تتضمن معلومات مرخصة بموجب رخصة الحكومة المفتوحة، مدينة أوتاوا. تقول المدينة إن هذه القائمة تُعدّ بأفضل جهد وقد تكون غير مكتملة. خريطة حركة المرور في مدينة أوتاوا ↗