Service Impact: Baseline Station Park and Ride – Temporary Lot Configuration
Publicado 2 may 2025 · sin fecha de fin
- Tiempo adicional
- Aún no se mide
- Velocidad máxima
- Sin medir
- Trenes de 6 a 8 h
- Aún no se mide
Las posiciones y velocidades de los trenes no se publican.
Los tiempos de recorrido de este tramo aún no se miden.
Aviso del operadorPublicado vie, 2 may, 15:40, actualizado vie, 30 oct, 11:12
Affected routes
No structured route association was published or safely derived.
Affected stops or stations
No structured stop or station association was published.
The source does not publish affected-service geometry. Otranspo shows the named routes and places and does not invent an impact map.
La fuente no publica un campo estructurado sobre el efecto en la accesibilidad.
May 02 2025 -
Starting Thursday, May 1, 2025, until further notice, the Park and Ride at Baseline Station will be temporarily split into two separate lots (north and south). All gold permit holders and accessible stalls will be located in the north lot, standard parking spaces will be available in the south lot.
Abrir el registro oficial de la fuente
Informar de un problema con esta alertaQué cambió
- lun, 19 oct, 10:41OC Transpo: texto modificado
- sáb, 3 oct, 17:47OC Transpo: texto modificado
- sáb, 3 oct, 17:47OC Transpo: visto por primera vez