Ambos · Cobertura do calendário completa · Preliminar · monthly-service-report-live-preview-v4
outubro de 2026 · both operators
77,6% of previsões de chegada de ônibus were within five minutes. Aos sábados were the weak spot.
Every day in outubro
Share within five minutes, each day- Weekday
- Sábado
- Sunday or holidaySunday / holiday
- Partial dataParcial
8 de outubro is not counted (too few records from either operator). 2 de outubro, 5, 9 até 13 and 15 count only the operator with enough records.
Where routes land
The largest group, 75 routes, sits at 80 to 100%. 7 routes fall below 60%.- Under 20%0
- 20 to 40%1
- 40 to 60%6
- 60 a 80%57
- 80 to 100%75
139 routes had enough data to rank. 1 more are listed separately: too little data or special service.
Every prediction, counted
- Em até cinco minutos
- 6.377.211
- Early or late by more
- 1.838.750
Outside five minutes covers early and late. Missed trips are counted separately, in Cancellations.
Ask about this report
Ask about this reportComo medimos isso
We check the arrival predictions OC Transpo and STO publish, once each trip has finished, and count how many landed within five minutes, early or late.
This tells you how far to trust the countdown on your screen. It is not an independent check of where the bus really was.
Full method, coverage and original editionFull evidence for this report
Findings by remedy, comparisons, every listed route, coverage, cancellations and how to cite this edition.
Cobertura do calendário completa · Preliminar
Ambos · outubro de 2026
Resumo para quem decide
Use esta página para fazer perguntas diretas ao operador. Os números descrevem dados salvos de previsão de ônibus. Não são uma contagem auditada de chegadas reais nem de todas as viagens previstas no horário.
Achado a examinar
O diagnóstico deste mês ainda não foi publicado. Ele é feito uma só vez, quando o mês termina, porque relê as previsões do fornecedor elegíveis para o mês.
Solicitação à operadora
Forneça os registros de chegada às paradas ou de despacho para as linhas e horas sinalizadas, a versão correspondente do horário e uma explicação operacional. Teste os efeitos em custo, frota, mão de obra e conexões antes de adotar uma correção.
Données probantes e limites
8.215.961 final eligible bus predictions across 149 routes in this scorecard. Regional calendar coverage: 31 of 31 days with figures. Physical arrival times were not independently verified.
Perguntas para o registro
- Os registros de veículos e de despacho do operador confirmam o padrão de linha por hora mostrado aqui?
- Quais viagens programadas não circularam, e quão completos foram os avisos públicos de cancelamento?
- Quais dados de horários, de posição dos veículos ou de chegada podem ser divulgados para validar os resultados dos ônibus e tornar possível o relatório sobre o trem?
O CSV exporta o mês inteiro, incluindo os dois operadores, a cobertura e o método. O seletor de operador muda o painel de indicadores, o subtotal de cancelamentos e os resultados por linha. A série diária e a cobertura do calendário continuam regionais, assim como as comparações com outros meses.
Dia a dia
Esta série diária cobre as duas operadoras, inclusive quando uma operadora está selecionada acima. Cada barra é um dia do calendário. Um mês informado como uma única porcentagem não mostra se ele foi uniformemente mediano ou bom, exceto por uma semana ruim.
Bars are scaled between 67% and 86%. Os dias de fim de semana estão marcados. O nível de serviço e as linhas representadas podem ser diferentes dos dias úteis. A linha fina sob cada barra mostra quanto daquele dia este site realmente mediu, em comparação com o dia mais bem medido do mês. Uma linha curta significa que a porcentagem acima dela se baseia em muito menos dados.
Abrir a tabela de dados dia a dia
| Data do serviço | Estado das evidências | Em até cinco minutos | Previsões elegíveis dos provedores | Cobertura relativa | Clima |
|---|---|---|---|---|---|
| 1 de out. de 2026 | Medido | 75,9% | 359.327 | 100% of the best-measured day | Sem clima relevante |
| 2 de out. de 2026 | Captado em parte; um operador ficou de fora, o valor não representa a rede | 80,8% | 88.624 | — | Sem clima relevante |
| 3 de out. de 2026 | Medido | 69,7% | 240.074 | 67% of the best-measured day | Sem clima relevante |
| 4 de out. de 2026 | Medido | 76,8% | 203.328 | 56% of the best-measured day | Sem clima relevante |
| 5 de out. de 2026 | Captado em parte; um operador ficou de fora, o valor não representa a rede | 83,4% | 276.376 | — | Gusts to 63 km/h |
| 6 de out. de 2026 | Medido | 77,4% | 360.314 | 100% of the best-measured day | Sem clima relevante |
| 7 de out. de 2026 | Medido | 76,6% | 360.186 | 100% of the best-measured day | Sem clima relevante |
| 8 de out. de 2026 | Captado em parte; um operador ficou de fora, o valor não representa a rede | — | 0 | — | Sem clima relevante |
| 9 de out. de 2026 | Captado em parte; um operador ficou de fora, o valor não representa a rede | 76,3% | 274.738 | — | Sem clima relevante |
| 10 de out. de 2026 | Captado em parte; um operador ficou de fora, o valor não representa a rede | 70,9% | 191.984 | — | Sem clima relevante |
| 11 de out. de 2026 | Captado em parte; um operador ficou de fora, o valor não representa a rede | 77,7% | 160.951 | — | Sem clima relevante |
| 12 de out. de 2026 | Captado em parte; um operador ficou de fora, o valor não representa a rede | 87,4% | 162.117 | — | Sem clima relevante |
| 13 de out. de 2026 | Captado em parte; um operador ficou de fora, o valor não representa a rede | 78,4% | 275.411 | — | Rain 24,2 mm |
| 14 de out. de 2026 | Medido | 75,9% | 359.884 | 100% of the best-measured day | Sem clima relevante |
| 15 de out. de 2026 | Captado em parte; um operador ficou de fora, o valor não representa a rede | 79,5% | 87.582 | — | Sem clima relevante |
| 16 de out. de 2026 | Medido | 81% | 357.948 | 99% of the best-measured day | Rain 17,4 mm |
| 17 de out. de 2026 | Medido | 70,9% | 229.165 | 64% of the best-measured day | Sem clima relevante |
| 18 de out. de 2026 | Medido | 77,2% | 201.369 | 56% of the best-measured day | Sem clima relevante |
| 19 de out. de 2026 | Medido | 80% | 351.995 | 98% of the best-measured day | Sem clima relevante |
| 20 de out. de 2026 | Medido | 76,5% | 350.320 | 97% of the best-measured day | Sem clima relevante |
| 21 de out. de 2026 | Medido | 76,2% | 319.525 | 89% of the best-measured day | Sem clima relevante |
| 22 de out. de 2026 | Medido | 75,3% | 320.138 | 89% of the best-measured day | Sem clima relevante |
| 23 de out. de 2026 | Medido | 79,3% | 352.029 | 98% of the best-measured day | Sem clima relevante |
| 24 de out. de 2026 | Medido | 70,4% | 229.997 | 64% of the best-measured day | Sem clima relevante |
| 25 de out. de 2026 | Medido | 74,5% | 160.318 | 44% of the best-measured day | Sem clima relevante |
| 26 de out. de 2026 | Medido | 83,3% | 312.810 | 87% of the best-measured day | Sem clima relevante |
| 27 de out. de 2026 | Medido | 80,1% | 350.664 | 97% of the best-measured day | Sem clima relevante |
| 28 de out. de 2026 | Medido | 80,8% | 341.481 | 95% of the best-measured day | Sem clima relevante |
| 29 de out. de 2026 | Medido | 79,6% | 351.555 | 98% of the best-measured day | Sem clima relevante |
| 30 de out. de 2026 | Medido | 80,3% | 354.049 | 98% of the best-measured day | Sem clima relevante |
| 31 de out. de 2026 | Medido | 72,9% | 231.702 | 64% of the best-measured day | Sem clima relevante |
Abrir a tabela de dados dia a dia
| Data do serviço | Estado das evidências | Em até cinco minutos | Previsões elegíveis dos provedores | Cobertura relativa | Clima |
|---|---|---|---|---|---|
| 1 de out. de 2026 | Medido | 75,9% | 359.327 | 100% of the best-measured day | Sem clima relevante |
| 2 de out. de 2026 | Captado em parte; um operador ficou de fora, o valor não representa a rede | 80,8% | 88.624 | — | Sem clima relevante |
| 3 de out. de 2026 | Medido | 69,7% | 240.074 | 67% of the best-measured day | Sem clima relevante |
| 4 de out. de 2026 | Medido | 76,8% | 203.328 | 56% of the best-measured day | Sem clima relevante |
| 5 de out. de 2026 | Captado em parte; um operador ficou de fora, o valor não representa a rede | 83,4% | 276.376 | — | Gusts to 63 km/h |
| 6 de out. de 2026 | Medido | 77,4% | 360.314 | 100% of the best-measured day | Sem clima relevante |
| 7 de out. de 2026 | Medido | 76,6% | 360.186 | 100% of the best-measured day | Sem clima relevante |
| 8 de out. de 2026 | Captado em parte; um operador ficou de fora, o valor não representa a rede | — | 0 | — | Sem clima relevante |
| 9 de out. de 2026 | Captado em parte; um operador ficou de fora, o valor não representa a rede | 76,3% | 274.738 | — | Sem clima relevante |
| 10 de out. de 2026 | Captado em parte; um operador ficou de fora, o valor não representa a rede | 70,9% | 191.984 | — | Sem clima relevante |
| 11 de out. de 2026 | Captado em parte; um operador ficou de fora, o valor não representa a rede | 77,7% | 160.951 | — | Sem clima relevante |
| 12 de out. de 2026 | Captado em parte; um operador ficou de fora, o valor não representa a rede | 87,4% | 162.117 | — | Sem clima relevante |
| 13 de out. de 2026 | Captado em parte; um operador ficou de fora, o valor não representa a rede | 78,4% | 275.411 | — | Rain 24,2 mm |
| 14 de out. de 2026 | Medido | 75,9% | 359.884 | 100% of the best-measured day | Sem clima relevante |
| 15 de out. de 2026 | Captado em parte; um operador ficou de fora, o valor não representa a rede | 79,5% | 87.582 | — | Sem clima relevante |
| 16 de out. de 2026 | Medido | 81% | 357.948 | 99% of the best-measured day | Rain 17,4 mm |
| 17 de out. de 2026 | Medido | 70,9% | 229.165 | 64% of the best-measured day | Sem clima relevante |
| 18 de out. de 2026 | Medido | 77,2% | 201.369 | 56% of the best-measured day | Sem clima relevante |
| 19 de out. de 2026 | Medido | 80% | 351.995 | 98% of the best-measured day | Sem clima relevante |
| 20 de out. de 2026 | Medido | 76,5% | 350.320 | 97% of the best-measured day | Sem clima relevante |
| 21 de out. de 2026 | Medido | 76,2% | 319.525 | 89% of the best-measured day | Sem clima relevante |
| 22 de out. de 2026 | Medido | 75,3% | 320.138 | 89% of the best-measured day | Sem clima relevante |
| 23 de out. de 2026 | Medido | 79,3% | 352.029 | 98% of the best-measured day | Sem clima relevante |
| 24 de out. de 2026 | Medido | 70,4% | 229.997 | 64% of the best-measured day | Sem clima relevante |
| 25 de out. de 2026 | Medido | 74,5% | 160.318 | 44% of the best-measured day | Sem clima relevante |
| 26 de out. de 2026 | Medido | 83,3% | 312.810 | 87% of the best-measured day | Sem clima relevante |
| 27 de out. de 2026 | Medido | 80,1% | 350.664 | 97% of the best-measured day | Sem clima relevante |
| 28 de out. de 2026 | Medido | 80,8% | 341.481 | 95% of the best-measured day | Sem clima relevante |
| 29 de out. de 2026 | Medido | 79,6% | 351.555 | 98% of the best-measured day | Sem clima relevante |
| 30 de out. de 2026 | Medido | 80,3% | 354.049 | 98% of the best-measured day | Sem clima relevante |
| 31 de out. de 2026 | Medido | 72,9% | 231.702 | 64% of the best-measured day | Sem clima relevante |
Bars are scaled between 67% and 86%. Os dias de fim de semana estão marcados. O nível de serviço e as linhas representadas podem ser diferentes dos dias úteis. A linha fina sob cada barra mostra quanto daquele dia este site realmente mediu, em comparação com o dia mais bem medido do mês. Uma linha curta significa que a porcentagem acima dela se baseia em muito menos dados.
- Melhor dia
- 26 de out. de 2026 · 83,3%
- Pior dia
- 3 de out. de 2026 · 69,7%
- Weather that day: Sem clima relevante.
O clima é mostrado como contexto. Ele não é usado para ajustar, justificar ou pontuar nenhum dado desta página.
Fonte: Environment and Climate Change Canada, dados climáticos diários e por hora do Aeroporto Internacional de Ottawa (ID climático 6106001). Um dia climático vai da meia-noite à meia-noite, no horário padrão local. No verão, pode diferir em uma hora do dia de serviço. Dados climáticos históricos ↗
O que deve mudar
Calculado com as previsões elegíveis dos provedores deste mês. Ordenado pela amostra que cada item afeta. Cada linha mostra o que as evidências do feed indicam, quando, e qual operador pode revisar.
O diagnóstico deste mês ainda não foi publicado. Ele é feito uma só vez, quando o mês termina, porque relê as previsões do fornecedor elegíveis para o mês.
Não abordado aqui
- Se os trajetos previstos realmente foram realizados. As previsões do provedor não comprovam a realização do trajeto. Isso exige outras provas.
- Se as previsões elegíveis do provedor indicam intervalos regulares ou agrupados nas linhas frequentes. Medido em uma janela recente móvel, que não pode ser reconstruída para este mês encerrado.
Em comparação com outros meses · os dois operadores
O mês anterior
setembro de 2026: 77% of eligible provider predictions within five minutes
30 of 30 calendar days with evidence · 8.031.476 eligible provider predictions · 150 routes
Comparação de previsões correspondentes
Isto compara as previsões finais válidas do provedor com os horários previstos. Não confirma chegadas físicas, não prova uma causa e não mostra serviço equivalente.
Esta publicação preservada usa um método anterior. As contagens de dias esperados são mostradas como foram registradas originalmente.
Mês civil completo anterior · 2026-09-01–2026-09-30
Pesos comuns por linha e dia da semana · prediction-comparison-v2
Atual
Taxa bruta elegível: —
Taxa de comparação pareada: —
— / — previsões elegíveis / previsões dentro do limite do horário previsto
As contagens de amostras não são divulgadas. Valores ausentes não são zero. A origem do horário está ausente
Referência
Taxa bruta elegível: —
Taxa de comparação pareada: —
— / — previsões elegíveis / previsões dentro do limite do horário previsto
As contagens de amostras não são divulgadas. Valores ausentes não são zero. A origem do horário está ausente
Uma diferença pareada não é publicada: A origem do horário está ausente
Cobertura por linha · —; Dias de linha correspondentes · não usado por este método; Dias de linha omitidos · —; Pesos comuns · —
As listas de dados probantes vazias não foram avaliadas para esta comparação recusada. A origem do horário está ausente
Versões do feed de horários: 05854a47-c0dc-4f34-b076-4827f6d196f0, 1ea7c84b-eae6-4787-8aaa-01523b4e6619, 2ce66ec0-4b13-470f-ad5e-045e7bbe5fab, 3932bee1-4577-4968-9a97-2987e88312ad, 44936c9b-7dbb-44c9-8e2c-6051bb87b4da, 54ca76e7-e78f-4623-a135-ab2c87e99d32, 6ee8491d-8f94-4122-a67b-ef228d9e0945, 9aab3e5d-2362-4d44-ab42-b8628a59d804, adf8b6f0-5fb9-4eca-bcb9-68f5235502fc, b6dda873-b797-49b3-a4a6-542fad672eef, ca455c71-c30a-4e4d-8b72-2709212731cd, cdda76b5-d299-4755-bb81-ca8cd4d16647, db43ff4c-ff08-4e90-845b-a8642cd1bcef, dd66f011-17ec-4399-858c-01706b8c5a64, debdbb8c-5a7b-407a-9f7b-52db7d3c7b85, e0f8038a-45e7-4a47-99c2-308c0f049f72, e582db1b-46c9-4756-8b25-9782f02ba21b, ece8fa79-2586-440c-9315-8c39b470256f, edd82b80-107c-4eac-9121-2bff2579fdf8 / —
O mesmo mês do ano passado
outubro de 2025 was not measured by this site.
Comparação de previsões correspondentes
Isto compara as previsões finais válidas do provedor com os horários previstos. Não confirma chegadas físicas, não prova uma causa e não mostra serviço equivalente.
Esta publicação preservada usa um método anterior. As contagens de dias esperados são mostradas como foram registradas originalmente.
Mesmo mês completo do ano passado · 2025-10-01–2025-10-31
Pesos comuns por linha e dia da semana · prediction-comparison-v2
Atual
Taxa bruta elegível: —
Taxa de comparação pareada: —
— / — previsões elegíveis / previsões dentro do limite do horário previsto
As contagens de amostras não são divulgadas. Valores ausentes não são zero. Falta um período de comparação
Referência
Taxa bruta elegível: —
Taxa de comparação pareada: —
— / — previsões elegíveis / previsões dentro do limite do horário previsto
As contagens de amostras não são divulgadas. Valores ausentes não são zero. Falta um período de comparação
Uma diferença pareada não é publicada: Falta um período de comparação
Cobertura por linha · —; Dias de linha correspondentes · não usado por este método; Dias de linha omitidos · —; Pesos comuns · —
As listas de dados probantes vazias não foram avaliadas para esta comparação recusada. Falta um período de comparação
Versões do feed de horários: 05854a47-c0dc-4f34-b076-4827f6d196f0, 1ea7c84b-eae6-4787-8aaa-01523b4e6619, 2ce66ec0-4b13-470f-ad5e-045e7bbe5fab, 3932bee1-4577-4968-9a97-2987e88312ad, 44936c9b-7dbb-44c9-8e2c-6051bb87b4da, 54ca76e7-e78f-4623-a135-ab2c87e99d32, 6ee8491d-8f94-4122-a67b-ef228d9e0945, 9aab3e5d-2362-4d44-ab42-b8628a59d804, adf8b6f0-5fb9-4eca-bcb9-68f5235502fc, b6dda873-b797-49b3-a4a6-542fad672eef, ca455c71-c30a-4e4d-8b72-2709212731cd, cdda76b5-d299-4755-bb81-ca8cd4d16647, db43ff4c-ff08-4e90-845b-a8642cd1bcef, dd66f011-17ec-4399-858c-01706b8c5a64, debdbb8c-5a7b-407a-9f7b-52db7d3c7b85, e0f8038a-45e7-4a47-99c2-308c0f049f72, e582db1b-46c9-4756-8b25-9782f02ba21b, ece8fa79-2586-440c-9315-8c39b470256f, edd82b80-107c-4eac-9121-2bff2579fdf8 / —
Furthest from the timetable in outubro de 2026
The routes with the lowest share of eligible final predictions within five minutes of the timetable. A low figure does not establish the cause; inspect the route evidence before drawing conclusions.
- 45STO33%8.318 eligible trip-stop predictions · 17 of 31 days
- 2344,5%5.849 eligible trip-stop predictions · 18 of 31 days
- 1747,1%7.855 eligible trip-stop predictions · 18 of 31 days
- 56STO47,3%10.276 eligible trip-stop predictions · 17 of 31 days
- 52STO52,8%42.880 eligible trip-stop predictions · 23 of 31 days
- 1354,1%16.520 eligible trip-stop predictions · 18 of 31 days
- 3257,9%10.324 eligible trip-stop predictions · 18 of 31 days
- 27STO60,7%5.408 eligible trip-stop predictions · 17 of 31 days
- 29STO61,6%3.262 eligible trip-stop predictions · 17 of 31 days
- 761,7%218.547 eligible trip-stop predictions · 28 of 31 days
Closest to the timetable in outubro de 2026
The routes with the highest share of eligible final provider predictions within five minutes of the timetable. All use the same route class, evidence threshold and period. This is a relative ranking, not an operator target or measured arrival rate.
- 8496,8%2.385 eligible trip-stop predictions · 18 of 31 days
- 79STO94,8%6.157 eligible trip-stop predictions · 17 of 31 days
- 72STO93,8%4.469 eligible trip-stop predictions · 23 of 31 days
- 75STO93,6%35.779 eligible trip-stop predictions · 23 of 31 days
- 17393,3%51.173 eligible trip-stop predictions · 28 of 31 days
- 77STO93%13.944 eligible trip-stop predictions · 23 of 31 days
- 6792,9%34.428 eligible trip-stop predictions · 28 of 31 days
- 9492,8%2.369 eligible trip-stop predictions · 18 of 31 days
- 15392,6%7.022 eligible trip-stop predictions · 28 of 31 days
- 9392,6%36.766 eligible trip-stop predictions · 28 of 31 days
Há amostra de previsões, mas não o suficiente do mês
Estas linhas tiveram previsões válidas do provedor em menos da metade dos dias com previsões neste mês. Essas previsões entram no valor da rede acima, mas as linhas ficam fora dos rankings porque a amostra cobre só parte do mês.
Somente resultados de ônibus: onde está o O-Train?
O O-Train não está incluído nestes números. Este boletim mensal é calculado a partir de previsões de horário de parada de ônibus salvas dos dados públicos das operadoras.
A Otranspo também acompanha posições de ônibus ao vivo, atualizações de viagem e avisos de cancelamento para orientar os passageiros. Este relatório usa um conjunto histórico mais restrito: a última previsão válida do operador para cada passagem de ônibus programada em uma parada, comparada com o horário. Esses registros não foram verificados de forma independente com uma chegada física à parada.
O feed público usado neste relatório não traz previsões de chegada do O-Train nem posições dos trens ao vivo. Um painel comparável para o trem precisa de observações ou previsões de trens com método documentado. O horário publicado dos trens sozinho não pode fornecer isso.
Cobertura do calendário completa
Every calendar day is accounted for: 31 of 31 days were measured and the remaining days, if any, have a recorded explanation. Publication status is shown separately below.
Status da publicação
Preliminar
Preliminary. Updated daily. Final once every day of the month is counted. Last updated 4 de nov. de 2026, 11:05. Method: monthly-service-report-live-preview-v4.
Dias por trás destes números
- Dias medidos
- 31 of 31
- Dias sem previsão válida já concluída
- 0
- Dias sem registro
- 0
Somente ônibus. O feed usado aqui não fornece previsões de chegada do O-Train nem posições de trens em tempo real. O transporte ferroviário fica fora de todos os números desta página.
Como citar esta página
OTranspo, service report for outubro de 2026, settled 4 de nov. de 2026, 11:05. https://otranspo.ca/pt/insights/reports/2026-10
- Números consolidados
- 4 de nov. de 2026, 11:05
- Método
- monthly-service-report-live-preview-v4
Este cálculo não é uma publicação final. Cite-o apenas com a data em que você o leu e volte depois para ver se há uma versão publicada.
O arquivo para baixar traz a mesma declaração de cobertura e as mesmas ressalvas desta página.