跳至主要內容

服務

回報問題

此頁面不是關於單一站牌、路線、車站或車輛。請開啟其中一項,讓回報註明它,或使用完整回報。

發生了什麼事
完整報告 不需要帳戶
服務

8月11日週二

服務

One day · 2026年8月11日 星期二 · final

One day · final

79.7% of final arrival predictions were within five minutes of the timetable on 8月11日 (previous measure).

The explanation has not been written for this edition yet. The measured figures are complete.

79.7%

Previous measure: final arrival predictions within five minutes of the timetablePrevious measure: predictions within five minutes

The trip totals are not measured yet for this period.

上一項指標

Previous measure, 8月11日: share of final arrival predictions within five minutes of the timetable. Not the new on-time measure.

The full report on the previous measure

Buses on time, hour by hour

The on-time bars are not measured yet for this period.

Your routes, and the day’s worst

The day’s worst routes

The route shares below are on the previous measure too: final arrival predictions within five minutes of the timetable. They are not graded.

  • 20
    20
    51%
  • 9
    9
    56%
  • 42
    42
    58%
  • 14
    14
    59%

Ask about this report

Search, not AI: answers are this edition’s own sentences, each linked.