42Blair <> Hurdman · preliminary, to Okt 31
Route 42 · Oktubre 2026 · Preliminary, figures to Okt 31
77.2% on time so far, 87 of 139 all-day routes.77.2% on time so far.
87 of 139 all-day routesTarget 85%
Did not runHindi pa nasusukat
up 1 points from Setyembre
7 of 31 measured days met the 85% target.
Oras na nawala sa mga pasahero: Hindi pa nasusukat
Target 85%
Month by month
Months this site has measured, grade under each. Never above the target. Oktubre outlined.
- Ago 69.4%
- Set 75.8%
- Okt 77.2%
Bottom of the table, Oktubre
The 139 ranked all-day routes, by share on time
What changed in Oktubre
Hindi pa po ito nasusukat.
Riders said
Hindi pa po ito nasusukat.
- Setyembre 2026 · 75.8% · DNobyembre starts Linggo
- More on OktubreBottom of the table, riders said, CSV
Take this month with you
- Download this monthCSV of the network report, Oktubre 2026CSV
- Share this monthWith the month’s social card
- Nakaraang buwanSetyembre 2026 · 75.8% · D Setyembre
- Susunod na buwanNobyembre starts Linggo