41St-Laurent <> Billings Bridge · preliminary, to Okt 31
Route 41 · Oktubre 2026 · Preliminary, figures to Okt 31
78.9% on time so far, 83 of 139 all-day routes.78.9% on time so far.
83 of 139 all-day routesTarget 85%
Did not runHindi pa nasusukat
unchanged from Setyembre
4 of 31 measured days met the 85% target.
Oras na nawala sa mga pasahero: Hindi pa nasusukat
Target 85%
C for 3 months in a row (3 shown).Month by month
C for 3 months in a row (3 shown). Never above the target. All bars in the 70 to 80 band; Oktubre outlined.
- Ago 77.8%
- Set 79%
- Okt 78.9%
Bottom of the table, Oktubre
The 139 ranked all-day routes, by share on time
What changed in Oktubre
Hindi pa po ito nasusukat.
Riders said
Hindi pa po ito nasusukat.
Take this month with you
- Download this monthCSV of the network report, Oktubre 2026CSV
- Share this monthWith the month’s social card
- Nakaraang buwanSetyembre 2026 · 79% · C Setyembre
- Susunod na buwanNobyembre starts Linggo