- Mga ruta
- 197Uplands / Greenboro
- Oktubre 2026
197Uplands / Greenboro · preliminary, to Okt 31
Route 197 · Oktubre 2026 · Preliminary, figures to Okt 31
91.6% on time so far, 13 of 139 all-day routes.91.6% on time so far.
13 of 139 all-day routesTarget 85%
Did not runHindi pa nasusukat
unchanged from Setyembre
26 of 30 measured days met the 85% target.
Oras na nawala sa mga pasahero: Hindi pa nasusukat
Target 85%
A for 3 months in a row (3 shown).Month by month
A for 3 months in a row (3 shown). All bars in the 90 to 100 band; Oktubre outlined.
- Ago 93.4%
- Set 91.7%
- Okt 91.6%
Bottom of the table, Oktubre
The 139 ranked all-day routes, by share on time
What changed in Oktubre
Hindi pa po ito nasusukat.
Riders said
Hindi pa po ito nasusukat.
- Setyembre 2026 · 91.7% · ANobyembre starts Linggo
- More on OktubreBottom of the table, riders said, CSV
Take this month with you
- Download this monthCSV of the network report, Oktubre 2026CSV
- Share this monthWith the month’s social card
- Nakaraang buwanSetyembre 2026 · 91.7% · A Setyembre
- Susunod na buwanNobyembre starts Linggo