- Mga ruta
- 112Billings Bridge <> Baseline
- Setyembre 2026
112Billings Bridge <> Baseline · inilathala noong Oktubre 4, 2026
Route 112 · Setyembre 2026 · Published Oktubre 4, 2026
88.8% on time, 21 of 140 all-day routes.88.8% on time.
21 of 140 all-day routesTarget 85%
Did not runHindi pa nasusukat
up 1 points from Agosto
23 of 29 measured days met the 85% target.
Oras na nawala sa mga pasahero: Hindi pa nasusukat
Target 85%
A for 2 months in a row (2 shown).Month by month
A for 2 months in a row (2 shown). All bars in the 80 to 90 band; Setyembre outlined.
- Ago 88.3%
- Set 88.8%
Bottom of the table, Setyembre
The 140 ranked all-day routes, by share on time
What changed in Setyembre
Hindi pa po ito nasusukat.
Riders said
Hindi pa po ito nasusukat.
Take this month with you
- Download this monthCSV of the network report, Setyembre 2026CSV
- Share this monthWith the month’s social card
- Nakaraang buwanAgosto 2026 · 88.3% · A Agosto
- Susunod na buwanOktubre starts Huwebes