111Billings Bridge / Carleton <> Baseline · preliminary, to Okt 31
Route 111 · Oktubre 2026 · Preliminary, figures to Okt 31
75.6% on time so far, 96 of 139 all-day routes.75.6% on time so far.
96 of 139 all-day routesTarget 85%
Did not runHindi pa nasusukat
up 4 points from Setyembre
3 of 31 measured days met the 85% target.
Oras na nawala sa mga pasahero: Hindi pa nasusukat
Target 85%
D for 2 months in a row (3 shown).Month by month
D for 2 months in a row (3 shown). Never above the target. Oktubre outlined.
- Ago 82.5%
- Set 72%
- Okt 75.6%
Bottom of the table, Oktubre
The 139 ranked all-day routes, by share on time
What changed in Oktubre
Hindi pa po ito nasusukat.
Riders said
Hindi pa po ito nasusukat.
Take this month with you
- Download this monthCSV of the network report, Oktubre 2026CSV
- Share this monthWith the month’s social card
- Nakaraang buwanSetyembre 2026 · 72% · D Setyembre