What happened
Full report No account needed

State of transit · Ottawa and Gatineaured tick = proposed target · line = last six months

Transit met 1 of the 1 proposed target we can measure in October 2026.

78.1% of arrival predictions were within five minutes.

Previous measure, Oct 5 – Nov 2. The new two-minute measures below are still being collected.

7 promises cannot be measured yet.

The month in plain words

We have not worked out why service fell short on Ottawa and Gatineau in October 2026 yet. We do this once a month.

  1. The bus comes

    Trips that ran

    Target 99.5%

    Not measured yet

    Target 99.5%

    Not measured yet
  2. On time

    Within 1 early to 5 late

    Target 85%

    Not measured yet

    Target 85%

    Not measured yet
  3. Short waits

    Extra wait, busy routes

    Target +2.0 min

    Not measured yet

    Target +2.0 min

    Not measured yet
  4. The trains run

    O-Train service delivered

    Target 99.0%

    Not measured yet

    Target 99.0%

    Not measured yet
  5. Room to board

    Trips too full to board

    0.0%

    Target 3.0%

    Kept
  6. Transfers work

    Connections made

    Target 95.0%

    Not measured yet

    Target 95.0%

    Not measured yet
  7. Countdown is right

    Within 2 minutes

    Target 90%

    Not measured yet

    Target 90%

    Not measured yet
  8. Everyone can ride

    Para Transpo on time

    Target 95.0%

    Not measured yet

    Target 95.0%

    Not measured yet

Proposed target: the red tick is a proposed target until it is adopted.

How we measure this

Read the October 2026 report · Transit Committee pack

On time since Line 1 opened

We have not measured on time this way for any month yet.

How we measure this

Dates of events and their sources

Furthest from their promise this month

No route has enough readings this month to rank.

Two ways to count on time

For one month we show the new measure beside the old one, so you can see the difference.

New measure

Observed on time

Not measured yet

New measure. Buses and trains seen at the stop, 1 minute early to 5 minutes late. A trip that never came counts as a miss.

Previous measure

Countdown accuracy

78.1%

Previous measure, Oct 5 – Nov 2. Share of final arrival predictions within five minutes of the timetable. Not the new two-minute target.

The comparison has not started. Until it does, the new measure is shown and the old one is labelled countdown accuracy.

How we measure this

We have no reading to show yet

We have not measured how close is each countdown? yet. We checked Nov 3, 2026, 09:46.

What is needed. We have not scored arrivals for this period yet.