Route 20 · October 2026 · Preliminary, figures to Oct 30
73.5% on time so far, 103 of 139 all-day routes.73.5% on time so far.
103 of 139 all-day routesTarget 85%
Did not runKawin mashi
up 2 points from September
5 of 18 measured days met the 85% target.
Kà-wanitòwàd pimosewininiwag: Kawin mashi
Target 85%Not run yet
D for 3 months in a row (3 shown).Month by month
D for 3 months in a row (3 shown). Never above the target. All bars in the 70 to 80 band; October outlined.
- Aug 70%
- Sep 72%
- Oct 73.5%
Bottom of the table, October
The 139 ranked all-day routes, by share on time