- Mikanan
- 20Rideau <> St-Laurent
- November 2026
OctoberDecember starts Tuesday
20Rideau <> St-Laurent · preliminary, to Nov 4
Route 20 · November 2026 · Preliminary, figures to Nov 4
60.9% on time so far, 124 of 136 all-day routes.60.9% on time so far.
124 of 136 all-day routesTarget 85%
Did not runKawin mashi
down 5 points from October
None of the 4 measured days met the 85% target.
Kà-wanitòwàd pimosewininiwag: Kawin mashi
Target 85%Not run yet
F for 4 months in a row (4 shown).Month by month
F for 4 months in a row (4 shown). Never above the target. November outlined.
- Aug 54.8%
- Sep 64%
- Oct 65.7%
- Nov 60.9%
Bottom of the table, November
The 136 ranked all-day routes, by share on time
What changed in November
Not measured yet.
Riders said
Not measured yet.
- October 2026 · 65.7% · FDecember starts Tuesday
- More on NovemberBottom of the table, riders said, CSV
Take this month with you
- Download this monthCSV of the network report, November 2026CSV
- Share this monthWith the month’s social card
- Kà-ishkwàsek kìzisOctober 2026 · 65.7% · F October
- Ani-bi-dagoshing giizisDecember starts Tuesday