48Hurdman <> Carleton · preliminary, to Nov 3
Route 48 · November 2026 · Preliminary, figures to Nov 3
77.6% on time so far, 83 of 135 all-day routes.77.6% on time so far.
83 of 135 all-day routesTarget 85%
Did not runKawin mashi
down 1 points from October
None of the 3 measured days met the 85% target.
Kà-wanitòwàd pimosewininiwag: Kawin mashi
Target 85%Not run yet
C for 3 months in a row (4 shown).Month by month
C for 3 months in a row (4 shown). Never above the target. November outlined.
- Aug 84%
- Sep 79.6%
- Oct 78.6%
- Nov 77.6%
Bottom of the table, November
The 135 ranked all-day routes, by share on time
What changed in November
Not measured yet.
Riders said
Not measured yet.
- October 2026 · 78.6% · CDecember starts Tuesday
- More on NovemberBottom of the table, riders said, CSV
Take this month with you
- Download this monthCSV of the network report, November 2026CSV
- Share this monthWith the month’s social card
- Kà-ishkwàsek kìzisOctober 2026 · 78.6% · C October
- Ani-bi-dagoshing giizisDecember starts Tuesday