41St-Laurent <> Billings Bridge · preliminary, to Oct 31
Route 41 · October 2026 · Preliminary, figures to Oct 31
78.9% on time so far, 83 of 139 all-day routes.78.9% on time so far.
83 of 139 all-day routesTarget 85%
Did not runKawin mashi
unchanged from September
4 of 31 measured days met the 85% target.
Kà-wanitòwàd pimosewininiwag: Kawin mashi
Target 85%
C for 3 months in a row (3 shown).Month by month
C for 3 months in a row (3 shown). Never above the target. All bars in the 70 to 80 band; October outlined.
- Aug 77.8%
- Sep 79%
- Oct 78.9%
Bottom of the table, October
The 139 ranked all-day routes, by share on time
What changed in October
Not measured yet.
Riders said
Not measured yet.
Take this month with you
- Download this monthCSV of the network report, October 2026CSV
- Share this monthWith the month’s social card
- Kà-ishkwàsek kìzisSeptember 2026 · 79% · C September
- Ani-bi-dagoshing giizisNovember starts Sunday