- Mikanan
- 38Blair <> Trim
- October 2026
38Blair <> Trim · preliminary, to Oct 31
Route 38 · October 2026 · Preliminary, figures to Oct 31
90.4% on time so far, 17 of 139 all-day routes.90.4% on time so far.
17 of 139 all-day routesTarget 85%
Did not runKawin mashi
unchanged from September
26 of 31 measured days met the 85% target.
Kà-wanitòwàd pimosewininiwag: Kawin mashi
Target 85%
A for 3 months in a row (3 shown).Month by month
A for 3 months in a row (3 shown). October outlined.
- Aug 88.3%
- Sep 90.2%
- Oct 90.4%
Bottom of the table, October
The 139 ranked all-day routes, by share on time
What changed in October
Not measured yet.
Riders said
Not measured yet.
- September 2026 · 90.2% · ANovember starts Sunday
- More on OctoberBottom of the table, riders said, CSV
Take this month with you
- Download this monthCSV of the network report, October 2026CSV
- Share this monthWith the month’s social card
- Kà-ishkwàsek kìzisSeptember 2026 · 90.2% · A September
- Ani-bi-dagoshing giizisNovember starts Sunday