- Mikanan
- 112Billings Bridge <> Baseline
- November 2026
OctoberDecember starts Tuesday
112Billings Bridge <> Baseline · preliminary, to Nov 4
Route 112 · November 2026 · Preliminary, figures to Nov 4
89.8% on time so far, 22 of 136 all-day routes.89.8% on time so far.
22 of 136 all-day routesTarget 85%
Did not runKawin mashi
unchanged from October
4 of 4 measured days met the 85% target.
Kà-wanitòwàd pimosewininiwag: Kawin mashi
Target 85%Not run yet
A for 4 months in a row (4 shown).Month by month
A for 4 months in a row (4 shown). November outlined.
- Aug 88.3%
- Sep 88.8%
- Oct 90%
- Nov 89.8%
Bottom of the table, November
The 136 ranked all-day routes, by share on time
What changed in November
Not measured yet.
Riders said
Not measured yet.
Take this month with you
- Download this monthCSV of the network report, November 2026CSV
- Share this monthWith the month’s social card
- Kà-ishkwàsek kìzisOctober 2026 · 90% · A October
- Ani-bi-dagoshing giizisDecember starts Tuesday