- Mikanan
- 10Hurdman <> Main
- November 2026
OctoberDecember starts Tuesday
10Hurdman <> Main · preliminary, to Nov 4
Route 10 · November 2026 · Preliminary, figures to Nov 4
77.1% on time so far, 82 of 136 all-day routes.77.1% on time so far.
82 of 136 all-day routesTarget 85%
Did not runKawin mashi
unchanged from October
None of the 4 measured days met the 85% target.
Kà-wanitòwàd pimosewininiwag: Kawin mashi
Target 85%Not run yet
Month by month
Months this site has measured, grade under each. Never above the target. November outlined.
- Aug 81.1%
- Sep 71.5%
- Oct 76.9%
- Nov 77.1%
Bottom of the table, November
The 136 ranked all-day routes, by share on time
What changed in November
Not measured yet.
Riders said
Not measured yet.
- October 2026 · 76.9% · DDecember starts Tuesday
- More on NovemberBottom of the table, riders said, CSV
Take this month with you
- Download this monthCSV of the network report, November 2026CSV
- Share this monthWith the month’s social card
- Kà-ishkwàsek kìzisOctober 2026 · 76.9% · D October
- Ani-bi-dagoshing giizisDecember starts Tuesday