- Mga ruta
- 98BUCKINGHAM
- Oktubre 2026
98BUCKINGHAM · preliminary, to Okt 30
Route 98 · Oktubre 2026 · Preliminary, figures to Okt 30
95.2% on time so far.95.2% on time so far.
Target 85%
Did not runHindi pa nasusukat
down 3 points from Setyembre
15 of 16 measured days met the 85% target.
Oras na nawala sa mga pasahero: Hindi pa nasusukat
Target 85%Not run yet
A for 3 months in a row (3 shown).Month by month
A for 3 months in a row (3 shown). All bars in the 90 to 100 band; Oktubre outlined.
- Ago 99.3%
- Set 97.8%
- Okt 95.2%
Bottom of the table, Oktubre
The 139 ranked all-day routes, by share on time
What changed in Oktubre
Hindi pa po ito nasusukat.
Riders said
Hindi pa po ito nasusukat.
- Setyembre 2026 · 97.8% · ANobyembre starts Linggo
- More on OktubreBottom of the table, riders said, CSV
Take this month with you
- Download this monthCSV of the network report, Oktubre 2026CSV
- Share this monthWith the month’s social card
- Nakaraang buwanSetyembre 2026 · 97.8% · A Setyembre
- Susunod na buwanNobyembre starts Linggo