59OTTAWA · preliminary, to Okt 31
Route 59 · Oktubre 2026 · Preliminary, figures to Okt 31
73.3% on time so far, 104 of 139 all-day routes.73.3% on time so far.
104 of 139 all-day routesTarget 85%
Did not runHindi pa nasusukat
up 3 points from Setyembre
3 of 25 measured days met the 85% target.
Oras na nawala sa mga pasahero: Hindi pa nasusukat
Target 85%
D for 2 months in a row (3 shown).Month by month
D for 2 months in a row (3 shown). Never above the target. All bars in the 70 to 80 band; Oktubre outlined.
- Ago 78.3%
- Set 70.2%
- Okt 73.3%
Bottom of the table, Oktubre
The 139 ranked all-day routes, by share on time
What changed in Oktubre
Hindi pa po ito nasusukat.
Riders said
Hindi pa po ito nasusukat.
- Setyembre 2026 · 70.2% · DNobyembre starts Linggo
- More on OktubreBottom of the table, riders said, CSV
Take this month with you
- Download this monthCSV of the network report, Oktubre 2026CSV
- Share this monthWith the month’s social card
- Nakaraang buwanSetyembre 2026 · 70.2% · D Setyembre
- Susunod na buwanNobyembre starts Linggo