- Mikanan
- 95BUCKINGHAM
- November 2026
OctoberDecember starts Tuesday
95BUCKINGHAM · preliminary, to Nov 3
Route 95 · November 2026 · Preliminary, figures to Nov 3
57.8% on time so far, 123 of 135 all-day routes.57.8% on time so far.
123 of 135 all-day routesTarget 85%
Did not runKawin mashi
down 17 points from October
1 of 2 measured days met the 85% target.
Kà-wanitòwàd pimosewininiwag: Kawin mashi
Target 85%Not run yet
Month by month
Months this site has measured, grade under each. Never above the target. November outlined.
- Aug 72.9%
- Sep 72.6%
- Oct 75.3%
- Nov 57.8%
Bottom of the table, November
The 135 ranked all-day routes, by share on time
What changed in November
Not measured yet.
Riders said
Not measured yet.
- October 2026 · 75.3% · DDecember starts Tuesday
- More on NovemberBottom of the table, riders said, CSV
Take this month with you
- Download this monthCSV of the network report, November 2026CSV
- Share this monthWith the month’s social card
- Kà-ishkwàsek kìzisOctober 2026 · 75.3% · D October
- Ani-bi-dagoshing giizisDecember starts Tuesday