93MASSON · preliminary, to Oct 30
Route 93 · October 2026 · Preliminary, figures to Oct 30
77.1% on time so far, 88 of 139 all-day routes.77.1% on time so far.
88 of 139 all-day routesTarget 85%
Did not runKawin mashi
up 8 points from September
5 of 18 measured days met the 85% target.
Kà-wanitòwàd pimosewininiwag: Kawin mashi
Target 85%Not run yet
Month by month
Months this site has measured, grade under each. October outlined.
- Aug 85.5%
- Sep 69.6%
- Oct 77.1%
Bottom of the table, October
The 139 ranked all-day routes, by share on time
What changed in October
Not measured yet.
Riders said
Not measured yet.
- September 2026 · 69.6% · DNovember starts Sunday
- More on OctoberBottom of the table, riders said, CSV
Take this month with you
- Download this monthCSV of the network report, October 2026CSV
- Share this monthWith the month’s social card
- Kà-ishkwàsek kìzisSeptember 2026 · 69.6% · D September
- Ani-bi-dagoshing giizisNovember starts Sunday