- Mikanan
- 68CGP G-ROY/STATION LORRAIN
- October 2026
68CGP G-ROY/STATION LORRAIN · preliminary, to Oct 30
Route 68 · October 2026 · Preliminary, figures to Oct 30
86.6% on time so far, 39 of 139 all-day routes.86.6% on time so far.
39 of 139 all-day routesTarget 85%
Did not runKawin mashi
unchanged from September
12 of 18 measured days met the 85% target.
Kà-wanitòwàd pimosewininiwag: Kawin mashi
Target 85%Not run yet
A for 3 months in a row (3 shown).Month by month
A for 3 months in a row (3 shown). October outlined.
- Aug 90.6%
- Sep 86.5%
- Oct 86.6%
Bottom of the table, October
The 139 ranked all-day routes, by share on time
What changed in October
Not measured yet.
Riders said
Not measured yet.
- September 2026 · 86.5% · ANovember starts Sunday
- More on OctoberBottom of the table, riders said, CSV
Take this month with you
- Download this monthCSV of the network report, October 2026CSV
- Share this monthWith the month’s social card
- Kà-ishkwàsek kìzisSeptember 2026 · 86.5% · A September
- Ani-bi-dagoshing giizisNovember starts Sunday