- Mikanan
- 27HAUTES-PLAINES
- October 2026
27HAUTES-PLAINES · preliminary, to Oct 30
Route 27 · October 2026 · Preliminary, figures to Oct 30
60.7% on time so far, 132 of 139 all-day routes.60.7% on time so far.
132 of 139 all-day routesTarget 85%
Did not runKawin mashi
down 3 points from September
2 of 18 measured days met the 85% target.
Kà-wanitòwàd pimosewininiwag: Kawin mashi
Target 85%Not run yet
F for 2 months in a row (3 shown).Month by month
F for 2 months in a row (3 shown). Never above the target. October outlined.
- Aug 76.6%
- Sep 63.7%
- Oct 60.7%
Bottom of the table, October
The 139 ranked all-day routes, by share on time
What changed in October
Not measured yet.
Riders said
Not measured yet.
- September 2026 · 63.7% · FNovember starts Sunday
- More on OctoberBottom of the table, riders said, CSV
Take this month with you
- Download this monthCSV of the network report, October 2026CSV
- Share this monthWith the month’s social card
- Kà-ishkwàsek kìzisSeptember 2026 · 63.7% · F September
- Ani-bi-dagoshing giizisNovember starts Sunday