Place d’Orléans mall pedestrian bridge closure
Gii-ozhibii'igaade Oct 16, 12:53 p.m. · kàwin ishkwà-giizhigad
- Extra time
- Kawin mashi
- Top speed
- Kawin tibàdjigàdesinon
- Trains 6–8 a.m.
- Kawin mashi
Train positions and speeds aren’t published.
Run times for this stretch are not measured yet.
WiindamaagewinOjibiigade Fri, Oct 16, 12:53 p.m., oshki Wed, Nov 4, 1:46 p.m.
Affected routes
No structured route association was published or safely derived.
Affected stops or stations
No structured stop or station association was published.
The source does not publish affected-service geometry. Otranspo shows the named routes and places and does not invent an impact map.
The source does not publish a structured accessibility-impact field.
October 16 2026 -
Starting October 19, the pedestrian bridge connecting Place d’Orléans Station to the upper level of Place d’Orléans Shopping Centre will be closed for approximately 5 weeks to allow construction work on shopping centre property.
Customers travelling between the station and the shopping centre should follow signage for the accessible ground-level pedestrian route via Entrance 1 of the shopping centre.
The pedestrian overpass between the transit station and the Park and Ride lot will remain open, and elevator service within the station will remain available.
Open the official source record
Wìndamàge ishpin mànàdad o'o dibàdjimowinKekon gà-andjisemagak
- Tue, Oct 20, 9:33 a.m.OC Transpo: ikidowinan aanjisemagadoon
- Tue, Oct 20, 9:32 a.m.OC Transpo: ikidowinan aanjisemagadoon
- Tue, Oct 20, 9:32 a.m.OC Transpo: ikidowinan aanjisemagadoon
- Fri, Oct 16, 12:59 p.m.OC Transpo: ikidowinan aanjisemagadoon
- Fri, Oct 16, 12:59 p.m.OC Transpo: Nitam gaa-waabandaming