20FREEMAN · preliminary, to 10月30日
Route 20 · 2026年10月 · Preliminary, figures to 10月30日
73.5% on time so far, 103 of 139 all-day routes.73.5% on time so far.
103 of 139 all-day routesTarget 85%
Did not run尚未測量
up 2 points from 9月
5 of 18 measured days met the 85% target.
乘客損失的時間: 尚未測量
Target 85%Not run yet
D for 3 months in a row (3 shown).Month by month
D for 3 months in a row (3 shown). Never above the target. All bars in the 70 to 80 band; 10月 outlined.
- 8月 70%
- 9月 72%
- 10月 73.5%
Bottom of the table, 10月
The 139 ranked all-day routes, by share on time
What changed in 10月
尚未測量。
Riders said
尚未測量。
Take this month with you
- Download this monthCSV of the network report, 2026年10月CSV
- Share this monthWith the month’s social card
- 上個月2026年9月 · 72% · D 9月
- 下個月11月 starts 星期日