Detour: Route 8 nightly during Chaudière Crossing closure
發布 10月26日 上午11:26 · 沒有結束日期
- 額外時間
- 尚未測量
- 最高速度
- 未測量
- 列車:上午 6–8
- 尚未測量
列車的位置和速度並未公布。
此路段的行車時間尚未量測。
營運單位通知發布於 10月26日週一 上午11:26,更新於 11月4日週三 下午1:46
Affected routes
Named by the operator feed
Affected stops or stations
No structured stop or station association was published.
The source does not publish affected-service geometry. Otranspo shows the named routes and places and does not invent an impact map.
資料來源未公布結構化的無障礙影響欄位。
October 26 2026 -
Nightly, between 8:00 pm and 5:00 am, from Wednesday, October 28 until Friday, November 6, Chaudière Crossing will be closed between Chaudière Private and Vimy Place. The closure is required to facilitate the reconstruction work on the Chaudière Crossing southern structures.
As a result, route 8 will detour in both directions via Portage Bridge (between rue Laurier in Gatineau and Wellington Street).
This detour will replace the routing of 8 Gatineau and 8 Dow's Lake for the Terrasses de la Chaudière - Building Envelop Replacement detour (between 8 pm and 5 am)
Please allow extra time for your travels.
Affected stops
| Bus Stop (560#) not in use | Routes | Alternate Stop |
|---|---|---|
| #5722 -- Booth (east-side) / Vimy | · 8 Gatineau | #1876 -- Booth (east-side) / Wellington |
| #0597 -- Booth (east-side) / Chaudière | · 8 Gatineau | #1876 -- Booth (east-side) / Wellington |
| #6530 -- Eddy (east-side) / Laurier | · 8 Gatineau | TEMP A -- Laval (east-side) / Laurier |
| #3161 -- Eddy (west-side) / Laurier | · 8 Dow's Lake ~ Lac Dow | TEMP B -- Laurier (north-side) / Eddy |
| #0596 -- Booth (west-side) / Zaida Eddy | · 8 Dow's Lake ~ Lac Dow | #1877 -- Booth (west-side) / Wellington |
| #0433 -- Booth (west-side) / Vimy | · 8 Dow's Lake ~ Lac Dow | #1877 -- Booth (west-side) / Wellington |
Detour routing
8 Gatineau: From Booth and Wellington, right Wellington, left Portage Bridge, left Laurier, right Eddy, left into Terrasses loop, left Alexandre-Tache, continue straight on Laurier to left Laval to regular routing.
8 Dow's Lake / Lac Dow: From Alexandre-Tache, cross over Eddy, continue Laurier, right Portage Bridge, right Wellington, cross over Booth, continue Kichi Zibi Mikan to right Vimy Place, follow around to right Booth to regular routing.
Detour map
有何變更
- 10月28日週三 下午8:24OC Transpo: 內容已更改
- 10月28日週三 下午8:24OC Transpo: 內容已更改
- 10月26日週一 下午1:54OC Transpo: 內容已更改
- 10月26日週一 下午1:54OC Transpo: 內容已更改
- 10月26日週一 上午11:30OC Transpo: 內容已更改
- 10月26日週一 上午11:30OC Transpo: 首次出現