跳到主要内容

地图

报告问题

发生了什么
完整报告 无需账户
报告

No 549 trips cancelled now · 0 did not run in 十一月Cancellations →

549

STO 线路 549: Gal.Aylmer Via Plateau/Vanier/Nv Frontières

开往 Collège NF0 buses · boards at · under each stop: the next bus (live dot = live, grey = sched.)
加载中

Slowest stretches · running measure, 10月7日 to 11月3日

Of the slowest stretches, the most time is lost between ⁨PLATEAU/EUROPE⁩ and ⁨du PLATEAU/du MARIGOT⁩.

  1. +0.1 分钟PLATEAU/EUROPE – du PLATEAU/du MARIGOT
    19 km/h seen, 19 km/h in the timetable
我们如何衡量 →

This is the running reliability measure, not the report-card measure: for each stretch between two stops, how long buses really took against how long the timetable allows, over 21 counted days at all hours. It shows which stretches run behind, not how often. The report-card measure replaces it as soon as it has enough weekdays.

Example: a one-kilometre stretch the timetable runs at 20 km/h takes 3 minutes; if buses averaged 15 km/h it took 4, so 1 minute is lost there.

The line right now · 14:56

The line right now · 14:56

No bus is reporting its position on the line now; next scheduled 15:17

开往 Collège NF0 buses · boards at · under each stop: the next bus (live dot = live, grey = sched.)

Stops and scheduled times from OC Transpo’s timetable (GTFS, 2026-11-04). Every time under a stop is from the timetable (sched.), not a prediction.

Right now on Route 549

0 条通知from OC Transpo
Planned change · 2026-11-02service change

Dated service

Trips scheduled that day

The timetable, notices and what the live feed says are shown apart. Seeing a bus on the map does not prove you can board it.

2026年11月3日 · 2 trips in the retained timetable · retained notices; capture coverage unverified

In short: 0 with a matched position · 2 with no matching position (to investigate) · 0 with an unknown outcome.

  1. 15:18– 15:57
    Trip sto:63296233Explicit notice: CANCELEDNo matching position; investigate, not a confirmed cancellation
  2. 15:18– 15:57
    Trip sto:63296234Explicit notice: CANCELEDNo matching position; investigate, not a confirmed cancellation
More on Route 549
报告

No 549 trips cancelled now · 0 did not run in 十一月Cancellations →

0 busesOpen on the map
Planned change · 2026-11-02service change

Would you count on route 549?

No sign-in needed. A vote from a device that is not signed in counts a little less than one from an account, and a person who rates many routes counts a little less on each, so no one voice outweighs the rest.

6 partial-capture days not counted.

88 scheduled trips with counted cancellation notices, 10月7日周三 to 11月3日周二.

Not counted: 0 trips with qualifying later matching vehicle observations and 0 for trips not in that day’s timetable.

取消次数最多的时段: 15时 (8)

最近取消的班次

  • 11月3日周二, Trip at 15:18
  • 11月3日周二, Trip at 15:18
  • 11月2日周一, Trip at 15:18
  • 11月2日周一, Trip at 15:18
  • 10月26日周一, Trip at 15:18

只有当 STO 针对该趟行程发布的通告给出原因时,才会显示原因。

Did not come (no bus seen, no notice), last 7 days: none among the trips we could check.

此线路附近的市政道路施工

All road work on Alerts

Road work and event closures the City of Ottawa has published, measured as near this route’s path. Near is not proof that the bus is detoured: check the operator’s alerts for that.

No City road work is listed near this route right now.

Source: City of Ottawa open data. City road work map

More on Route 549

  • Other days2026年10月
    Days →
  • Today’s timelineArchived bus positions in Replay
    Replay →
  • Road work on this routeStops moved and time added by road work
    Works →
  • Service change scorecardHow a service change did
    Scorecard →
  • Crowding and service deliverySTO crowding, rail, trips delivered
    Crowding →
  • 数据来自哪里OC Transpo timetable and live bus positions
    Sources →
  • Page not loading?The timetable still opens
    重试
  • 完整报告卡
  • 告诉您的市议员
  • Fix this routePropose a change to this route in Design the network
    Fix this →
  • Change this routeDraw a different route or timetable in Design the network
    Change this route →