- 线路
- 92Greenboro <> Walkley / Hurdman
- 2026年10月
92Greenboro <> Walkley / Hurdman · preliminary, to 10月30日
Route 92 · 2026年10月 · Preliminary, figures to 10月30日
76.2% on time so far, 94 of 139 all-day routes.76.2% on time so far.
94 of 139 all-day routesTarget 85%
Did not run尚未测量
down 1 points from 九月
1 of 21 measured days met the 85% target.
乘客损失的时间: 尚未测量
Target 85%Not run yet
D for 2 months in a row (3 shown).Month by month
D for 2 months in a row (3 shown). Never above the target. All bars in the 70 to 80 band; 十月 outlined.
- 8月 78.6%
- 9月 76.9%
- 10月 76.2%
Bottom of the table, 十月
The 139 ranked all-day routes, by share on time
What changed in 十月
尚未测量。
Riders said
尚未测量。
Take this month with you
- Download this monthCSV of the network report, 2026年10月CSV
- Share this monthWith the month’s social card
- 上个月2026年9月 · 76.9% · D 九月
- 下个月十一月 starts 星期日