- 线路
- 84Centrepointe <> Baseline
- 2026年10月
84Centrepointe <> Baseline · preliminary, to 10月30日
Route 84 · 2026年10月 · Preliminary, figures to 10月30日
96.8% on time so far, 1 of 139 all-day routes.96.8% on time so far.
1 of 139 all-day routesTarget 85%
Did not run尚未测量
up 1 points from 九月
19 of 20 measured days met the 85% target.
乘客损失的时间: 尚未测量
Target 85%Not run yet
A for 2 months in a row (2 shown).Month by month
A for 2 months in a row (2 shown). All bars in the 90 to 100 band; 十月 outlined.
- 9月 96.2%
- 10月 96.8%
Bottom of the table, 十月
The 139 ranked all-day routes, by share on time
What changed in 十月
尚未测量。
Riders said
尚未测量。
Take this month with you
- Download this monthCSV of the network report, 2026年10月CSV
- Share this monthWith the month’s social card
- 上个月2026年9月 · 96.2% · A 九月
- 下个月十一月 starts 星期日