57Tunney's Pasture & N Rideau <> Carling Campus ~ Complexe Carling · preliminary, to 10月31日
Route 57 · 2026年10月 · Preliminary, figures to 10月31日
72.8% on time so far, 106 of 139 all-day routes.72.8% on time so far.
106 of 139 all-day routesTarget 85%
Did not run尚未测量
up 2 points from 九月
1 of 31 measured days met the 85% target.
乘客损失的时间: 尚未测量
Target 85%
D for 2 months in a row (3 shown).Month by month
D for 2 months in a row (3 shown). Never above the target. 十月 outlined.
- 8月 66.5%
- 9月 71.2%
- 10月 72.8%
Bottom of the table, 十月
The 139 ranked all-day routes, by share on time
What changed in 十月
尚未测量。
Riders said
尚未测量。
Take this month with you
- Download this monthCSV of the network report, 2026年10月CSV
- Share this monthWith the month’s social card
- 上个月2026年9月 · 71.2% · D 九月
- 下个月十一月 starts 星期日