- 线路
- 41St-Laurent <> Billings Bridge
- 2026年10月
41St-Laurent <> Billings Bridge · preliminary, to 10月31日
Route 41 · 2026年10月 · Preliminary, figures to 10月31日
78.9% on time so far, 83 of 139 all-day routes.78.9% on time so far.
83 of 139 all-day routesTarget 85%
Did not run尚未测量
unchanged from 九月
4 of 31 measured days met the 85% target.
乘客损失的时间: 尚未测量
Target 85%
C for 3 months in a row (3 shown).Month by month
C for 3 months in a row (3 shown). Never above the target. All bars in the 70 to 80 band; 十月 outlined.
- 8月 77.8%
- 9月 79%
- 10月 78.9%
Bottom of the table, 十月
The 139 ranked all-day routes, by share on time
What changed in 十月
尚未测量。
Riders said
尚未测量。
Take this month with you
- Download this monthCSV of the network report, 2026年10月CSV
- Share this monthWith the month’s social card
- 上个月2026年9月 · 79% · C 九月
- 下个月十一月 starts 星期日