18St-Laurent <> Billings Bridge · preliminary, to 10月31日
Route 18 · 2026年10月 · Preliminary, figures to 10月31日
64.8% on time so far, 123 of 139 all-day routes.64.8% on time so far.
123 of 139 all-day routesTarget 85%
Did not run尚未测量
unchanged from 九月
None of the 31 measured days met the 85% target.
乘客损失的时间: 尚未测量
Target 85%
F for 3 months in a row (3 shown).Month by month
F for 3 months in a row (3 shown). Never above the target. 十月 outlined.
- 8月 52.7%
- 9月 64.7%
- 10月 64.8%
Bottom of the table, 十月