跳到主要内容

服务

报告问题

此页面不是关于某个站点、线路、车站或车辆的。请打开其中一个,让报告写明它,或者使用完整报告。

发生了什么
完整报告 无需账户
服务

9月30日周三

服务

One day · 2026年9月30日星期三 · final

One day · final

83.6% of final arrival predictions were within five minutes of the timetable on 9月30日 (previous measure).

The explanation has not been written for this edition yet. The measured figures are complete.

83.6%

Previous measure: final arrival predictions within five minutes of the timetablePrevious measure: predictions within five minutes

The trip totals are not measured yet for this period.

上一项指标

Previous measure, 9月30日: share of final arrival predictions within five minutes of the timetable. Not the new on-time measure.

The full report on the previous measure

Buses on time, hour by hour

The on-time bars are not measured yet for this period.

  1. 8:00
    Works begin, Sep 30QUEEN between METCALFE and ELGINFrom a City works notice

Your routes, and the day’s worst

The day’s worst routes

The routes are not measured yet for this period.

Ask about this report

Search, not AI: answers are this edition’s own sentences, each linked.