- Ohahà:
- 189Colonnade <> Baseline
- October 2026
189Colonnade <> Baseline · preliminary, to Oct 31
Route 189 · October 2026 · Preliminary, figures to Oct 31
89.2% on time so far, 21 of 139 all-day routes.89.2% on time so far.
21 of 139 all-day routesTarget 85%
Did not runShé:kon iah tetewatahsónteren
unchanged from September
23 of 31 measured days met the 85% target.
Tsi niió:re wahón:nise: Shé:kon iah tetewatahsónteren
Target 85%
A for 3 months in a row (3 shown).Month by month
A for 3 months in a row (3 shown). October outlined.
- Aug 91.3%
- Sep 88.9%
- Oct 89.2%
Bottom of the table, October
The 139 ranked all-day routes, by share on time
What changed in October
Not measured yet.
Riders said
Not measured yet.
- September 2026 · 88.9% · ANovember starts Sunday
- More on OctoberBottom of the table, riders said, CSV
Take this month with you
- Download this monthCSV of the network report, October 2026CSV
- Share this monthWith the month’s social card
- Ohén:tonSeptember 2026 · 88.9% · A September
- Ó:ia' wenhni:tareNovember starts Sunday