- Ohahà:
- 17Wateridge <> Parliament ~ Parlement
- October 2026
17Wateridge <> Parliament ~ Parlement · preliminary, to Oct 30
Route 17 · October 2026 · Preliminary, figures to Oct 30
47.1% on time so far, 137 of 139 all-day routes.47.1% on time so far.
137 of 139 all-day routesTarget 85%
Did not runShé:kon iah tetewatahsónteren
down 4 points from September
None of the 20 measured days met the 85% target.
Tsi niió:re wahón:nise: Shé:kon iah tetewatahsónteren
Target 85%Not run yet
F for 3 months in a row (3 shown).Month by month
F for 3 months in a row (3 shown). Never above the target. October outlined.
- Aug 68.4%
- Sep 51.1%
- Oct 47.1%
Bottom of the table, October
The 139 ranked all-day routes, by share on time
What changed in October
Not measured yet.
Riders said
Not measured yet.
- September 2026 · 51.1% · FNovember starts Sunday
- More on OctoberBottom of the table, riders said, CSV
Take this month with you
- Download this monthCSV of the network report, October 2026CSV
- Share this monthWith the month’s social card
- Ohén:tonSeptember 2026 · 51.1% · F September
- Ó:ia' wenhni:tareNovember starts Sunday