- Ohahà:
- 189Colonnade <> Baseline
- September 2026
189Colonnade <> Baseline · published October 4, 2026
Route 189 · September 2026 · Published October 4, 2026
88.9% on time, 20 of 140 all-day routes.88.9% on time.
20 of 140 all-day routesTarget 85%
Did not runShé:kon iah tetewatahsónteren
down 2 points from August
24 of 30 measured days met the 85% target.
Tsi niió:re wahón:nise: Shé:kon iah tetewatahsónteren
Target 85%
A for 2 months in a row (2 shown).Month by month
A for 2 months in a row (2 shown). September outlined.
- Aug 91.3%
- Sep 88.9%
Bottom of the table, September
The 140 ranked all-day routes, by share on time
What changed in September
Not measured yet.
Riders said
Not measured yet.
- August 2026 · 91.3% · AOctober starts Thursday
- More on SeptemberBottom of the table, riders said, CSV
Take this month with you
- Download this monthCSV of the network report, September 2026CSV
- Share this monthWith the month’s social card
- Ohén:tonAugust 2026 · 91.3% · A August
- Ó:ia' wenhni:tareOctober starts Thursday