One day · ۱۴۰۵ آبان ۶, چهارشنبه · final
One day · final
80.8% of final arrival predictions were within five minutes of the timetable on ۶ آبان (previous measure).
The explanation has not been written for this edition yet. The measured figures are complete.
80.8%
Previous measure: final arrival predictions within five minutes of the timetablePrevious measure: predictions within five minutes
The trip totals are not measured yet for this period.
معیار قبلی
Previous measure, ۶ آبان: share of final arrival predictions within five minutes of the timetable. Not the new on-time measure.
Buses on time, hour by hour
The on-time bars are not measured yet for this period.
- ۸:۰۰Works begin, Oct 28ST-LAURENT, BOUL N/B between INNES / INDUSTRIAL and BELFASTFrom a City works notice
Your routes, and the day’s worst
The day’s worst routes
The route shares below are on the previous measure too: final arrival predictions within five minutes of the timetable. They are not graded.
- 232322%
- 171735%
- 454536%
- 565638%
Ask about this report
Search, not AI: answers are this edition’s own sentences, each linked.