OctoberDecember starts Tuesday
42Blair <> Hurdman · preliminary, to Nov 3
Route 42 · November 2026 · Preliminary, figures to Nov 3
76.3% on time so far, 88th of 135 all-day routes.76.3% on time so far.
88th of 135 all-day routesTarget 85%
Did not runNot measured yet
down 1 points from October
None of the 3 measured days met the 85% target.
Rider time lost: Not measured yet
Target 85%Not run yet
Month by month
Months this site has measured, grade under each. Never above the target. November outlined.
- Aug 69.4%
- Sep 75.8%
- Oct 77.2%
- Nov 76.3%
Bottom of the table, November
The 135 ranked all-day routes, by share on time
What changed in November
Not measured yet.
Riders said
Not measured yet.
- October 2026 · 77.2% · CDecember starts Tuesday
- More on NovemberBottom of the table, riders said, CSV
Take this month with you
- Download this monthCSV of the network report, November 2026CSV
- Share this monthWith the month’s social card
- Previous monthOctober 2026 · 77.2% · C October