- Routes
- 198Limebank <> Greenboro
- November 2026
OctoberDecember starts Tuesday
198Limebank <> Greenboro · preliminary, to Nov 3
Route 198 · November 2026 · Preliminary, figures to Nov 3
65.4% on time so far, 113th of 135 all-day routes.65.4% on time so far.
113th of 135 all-day routesTarget 85%
Did not runNot measured yet
unchanged from October
None of the 2 measured days met the 85% target.
Rider time lost: Not measured yet
Target 85%Not run yet
F for 3 months in a row (4 shown).Month by month
F for 3 months in a row (4 shown). November outlined.
- Aug 85.5%
- Sep 68.5%
- Oct 65%
- Nov 65.4%
Bottom of the table, November
The 135 ranked all-day routes, by share on time
What changed in November
Not measured yet.
Riders said
Not measured yet.
Take this month with you
- Download this monthCSV of the network report, November 2026CSV
- Share this monthWith the month’s social card
- Previous monthOctober 2026 · 65% · F October
- Next monthDecember starts Tuesday