- Routes
- 187Baseline <> Amberwood
- November 2026
OctoberDecember starts Tuesday
187Baseline <> Amberwood · preliminary, to Nov 3
Route 187 · November 2026 · Preliminary, figures to Nov 3
88.2% on time so far, 32nd of 135 all-day routes.88.2% on time so far.
32nd of 135 all-day routesTarget 85%
Did not runNot measured yet
up 6 points from October
2 of 2 measured days met the 85% target.
Rider time lost: Not measured yet
Target 85%Not run yet
Month by month
Months this site has measured, grade under each. November outlined.
- Aug 88.5%
- Sep 79.2%
- Oct 82.3%
- Nov 88.2%
Bottom of the table, November
The 135 ranked all-day routes, by share on time
What changed in November
Not measured yet.
Riders said
Not measured yet.
- October 2026 · 82.3% · BDecember starts Tuesday
- More on NovemberBottom of the table, riders said, CSV
Take this month with you
- Download this monthCSV of the network report, November 2026CSV
- Share this monthWith the month’s social card
- Previous monthOctober 2026 · 82.3% · B October
- Next monthDecember starts Tuesday