32PLATEAU · preliminary, to 10月30日
Route 32 · 2026年10月 · Preliminary, figures to 10月30日
77.1% on time so far, 89 of 139 all-day routes.77.1% on time so far.
89 of 139 all-day routesTarget 85%
Did not run尚未测量
up 7 points from 九月
2 of 19 measured days met the 85% target.
乘客损失的时间: 尚未测量
Target 85%Not run yet
Month by month
Months this site has measured, grade under each. Never above the target. All bars in the 70 to 80 band; 十月 outlined.
- 8月 72.7%
- 9月 70.1%
- 10月 77.1%
Bottom of the table, 十月
The 139 ranked all-day routes, by share on time
What changed in 十月
尚未测量。
Riders said
尚未测量。
Take this month with you
- Download this monthCSV of the network report, 2026年10月CSV
- Share this monthWith the month’s social card
- 上个月2026年9月 · 70.1% · D 九月
- 下个月十一月 starts 星期日