Detour Route 75 South
运营商
自 6月8日 3:35 · 截至 2027年6月9日
- 额外时间
- 尚未测量
- 最高速度
- 未测量
- 列车 上午 6–8
- 尚未测量
列车的位置和速度不对外公布。
这一段的运行时间目前还没有测量。
运营方通知
Affected routes
Named by the operator feed
Affected stops or stations
- SAINTE-ROSE/ROBERT-CORBETT
- SAINTE-ROSE/TURGEON
- SAINTE-ROSE/MITCHELL
- MALONEY EST/DUPUIS
- SAINTE-ROSE/LORRAIN
- des SABLES/du SAGUENAY
- STATION LORRAIN
- NOTRE-DAME/DORÉ
- DORÉ/MALONEY EST
The source does not publish affected-service geometry. Otranspo shows the named routes and places and does not invent an impact map.
运营方未在结构化类型中标明无障碍问题。这并不能证明没有无障碍影响。
Route 75 diverted from Dupuis to Chamberland.
Notice display: Within a published period
Service impact stated by the operator: Timing cannot be confirmed
Legacy timing states when to show the notice; it does not independently confirm when service was physically affected.
Current source period: 1
Timing assessed at: 2026-11-04T09:44:59.180Z
All source periods (1)
Times use Toronto time. Each period includes its start and excludes its end.
Showing 1–1 of 1 source periods
- Legacy notice periods · 1
—
有哪些变化
- 11月2日周一 3:36STO: 文字已更改
- 10月31日周六 3:36STO: 文字已更改
- 10月29日周四 3:37STO: 文字已更改
- 10月29日周四 3:36STO: 文字已更改
- 10月28日周三 3:37STO: 文字已更改
- 10月25日周日 3:36STO: 文字已更改
- 10月24日周六 3:37STO: 文字已更改
- 10月23日周五 3:37STO: 文字已更改
- 10月17日周六 3:37STO: 文字已更改
- 10月16日周五 3:37STO: 文字已更改
- 10月14日周三 3:36STO: 文字已更改
- 10月11日周日 3:37STO: 文字已更改
- 10月10日周六 3:38STO: 首次出现