- Khadadka
- 99Barrhaven Centre <> Limebank
- Noofeembar 2026
OktoobarDiseembar starts Talaado
99Barrhaven Centre <> Limebank · preliminary, to Nof 3
Route 99 · Noofeembar 2026 · Preliminary, figures to Nof 3
84.5% on time so far, 55 of 135 all-day routes.84.5% on time so far.
55 of 135 all-day routesTarget 85%
Did not runWeli lama cabbirin
up 1 points from Oktoobar
1 of 3 measured days met the 85% target.
Waqtiga rakaabka lumay: Weli lama cabbirin
Target 85%Not run yet
B for 4 months in a row (4 shown).Month by month
B for 4 months in a row (4 shown). Never above the target. All bars in the 80 to 90 band; Noofeembar outlined.
- Ogs 84.7%
- Seb 84.6%
- Okt 83.6%
- Nof 84.5%
Bottom of the table, Noofeembar
The 135 ranked all-day routes, by share on time
What changed in Noofeembar
Weli lama cabbirin.
Riders said
Weli lama cabbirin.
- Oktoobar 2026 · 83.6% · BDiseembar starts Talaado
- More on NoofeembarBottom of the table, riders said, CSV
Take this month with you
- Download this monthCSV of the network report, Noofeembar 2026CSV
- Share this monthWith the month’s social card
- Bishii horeOktoobar 2026 · 83.6% · B Oktoobar
- Bisha danbeDiseembar starts Talaado