- ᐊᖁᑏᑦ
- 8Gatineau <> Dow's Lake ~ Lac Dow
- October 2026
8Gatineau <> Dow's Lake ~ Lac Dow · preliminary, to Oct 31
Route 8 · October 2026 · Preliminary, figures to Oct 31
79.9% on time so far, 76 of 139 all-day routes.79.9% on time so far.
76 of 139 all-day routesTarget 85%
Did not runᓱᓕ ᐅᒃᑐᖅᑕᐅᓯᒪᙱᑦᑐᖅ
up 4 points from September
9 of 31 measured days met the 85% target.
ᐊᑐᖅᑎᑦ ᐱᕕᖏᑦ ᐊᓯᐅᔪᑦ: ᓱᓕ ᐅᒃᑐᖅᑕᐅᓯᒪᙱᑦᑐᖅ
Target 85%
Month by month
Months this site has measured, grade under each. Never above the target. October outlined.
- Aug 83.1%
- Sep 76.1%
- Oct 79.9%
Bottom of the table, October
The 139 ranked all-day routes, by share on time
What changed in October
Not measured yet.
Riders said
Not measured yet.
- September 2026 · 76.1% · DNovember starts Sunday
- More on OctoberBottom of the table, riders said, CSV
Take this month with you
- Download this monthCSV of the network report, October 2026CSV ᑎᑎᖅᑲᖅ
- Share this monthWith the month’s social card
- ᑕᖅᑭᖅ ᐊᓂᒍᖅᑐᖅSeptember 2026 · 76.1% · D September
- ᑕᖅᑭᖅ ᖃᐃᔪᖅNovember starts Sunday