- ᐊᖁᑏᑦ
- 26Pineview <> Blair
- October 2026
26Pineview <> Blair · preliminary, to Oct 30
Route 26 · October 2026 · Preliminary, figures to Oct 30
88.4% on time so far, 26 of 139 all-day routes.88.4% on time so far.
26 of 139 all-day routesTarget 85%
Did not runᓱᓕ ᐅᒃᑐᖅᑕᐅᓯᒪᙱᑦᑐᖅ
up 3 points from September
13 of 20 measured days met the 85% target.
ᐊᑐᖅᑎᑦ ᐱᕕᖏᑦ ᐊᓯᐅᔪᑦ: ᓱᓕ ᐅᒃᑐᖅᑕᐅᓯᒪᙱᑦᑐᖅ
Target 85%Not run yet
A for 3 months in a row (3 shown).Month by month
A for 3 months in a row (3 shown). October outlined.
- Aug 92.9%
- Sep 85.7%
- Oct 88.4%
Bottom of the table, October
The 139 ranked all-day routes, by share on time
What changed in October
Not measured yet.
Riders said
Not measured yet.
- September 2026 · 85.7% · ANovember starts Sunday
- More on OctoberBottom of the table, riders said, CSV
Take this month with you
- Download this monthCSV of the network report, October 2026CSV ᑎᑎᖅᑲᖅ
- Share this monthWith the month’s social card
- ᑕᖅᑭᖅ ᐊᓂᒍᖅᑐᖅSeptember 2026 · 85.7% · A September
- ᑕᖅᑭᖅ ᖃᐃᔪᖅNovember starts Sunday