- ᐊᖁᑏᑦ
- 197Uplands / Greenboro
- October 2026
197Uplands / Greenboro · preliminary, to Oct 31
Route 197 · October 2026 · Preliminary, figures to Oct 31
91.6% on time so far, 13 of 139 all-day routes.91.6% on time so far.
13 of 139 all-day routesTarget 85%
Did not runᓱᓕ ᐅᒃᑐᖅᑕᐅᓯᒪᙱᑦᑐᖅ
unchanged from September
26 of 30 measured days met the 85% target.
ᐊᑐᖅᑎᑦ ᐱᕕᖏᑦ ᐊᓯᐅᔪᑦ: ᓱᓕ ᐅᒃᑐᖅᑕᐅᓯᒪᙱᑦᑐᖅ
Target 85%
A for 3 months in a row (3 shown).Month by month
A for 3 months in a row (3 shown). All bars in the 90 to 100 band; October outlined.
- Aug 93.4%
- Sep 91.7%
- Oct 91.6%
Bottom of the table, October
The 139 ranked all-day routes, by share on time
What changed in October
Not measured yet.
Riders said
Not measured yet.
- September 2026 · 91.7% · ANovember starts Sunday
- More on OctoberBottom of the table, riders said, CSV
Take this month with you
- Download this monthCSV of the network report, October 2026CSV ᑎᑎᖅᑲᖅ
- Share this monthWith the month’s social card
- ᑕᖅᑭᖅ ᐊᓂᒍᖅᑐᖅSeptember 2026 · 91.7% · A September
- ᑕᖅᑭᖅ ᖃᐃᔪᖅNovember starts Sunday